|
+Article 7 4. |
Article 7 4.Without prejudice to paragraph 1, a ship may proceed to the next port of call without delivering the waste, if:
(a)
the information provided in accordance with Annexes 2 and 3 shows that there is sufficient dedicated storage capacity for all waste that has been accumulated and will be accumulated during the intended voyage of the ship until the next port of call;
(b)
the information available on board ships falling outside the scope of Directive 2002/59/EC shows that there is sufficient dedicated storage capacity for all waste that has been accumulated and will be accumulated during the intended voyage of the ship until the next port of call; or
(c)
the ship only calls at anchorage for less than 24 hours or under adverse weather conditions, unless such an area has been excluded in accordance with the second subparagraph of Article 3(1). In order to ensure uniform conditions for the implementation of the exception referred to in points (a) and (b) of the first subparagraph, the Commission shall adopt implementing acts to define the methods to be used for the calculation of the sufficient dedicated storage capacity. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 20(2). 1. Apžvalga
1.1 Nuorodos1.2 Nustatyti reikalavimai1.3 Susiję standartai2. Nustatyti reikalavimai
3. Susiję standartai
|