+2. For all components of distribution and transmission networks, LDAR surveys shall be carried out …

2. For all components of distribution and transmission networks, LDAR surveys shall be carried out …

2.

For all components of distribution and transmission networks, LDAR surveys shall be carried out at the following minimum frequency:

Type of LDAR survey

Type of component

Frequency

Type 1 LDAR survey

(design pressure > 16 bar)

Compressor station

Regulating and metering station

4 months

 

Valve station

9 months

Type 2 LDAR survey

(design pressure > 16 bar)

Compressor station

Regulating and metering station

8 months

 

Valve station

18 months

Type 2 LDAR survey

(design pressure ≤ 16 bar)

Regulating and metering station

9 months

 

Valve station

21 months

Type of LDAR survey

Type of material

Frequency of survey

Type 1 LDAR survey

(design pressure > 16 bar)

Grey cast iron

Bitumen sheet

3 months

 

Asbestos

Ductile cast iron

6 months

 

Non-protected steel

Copper

12 months

 

Polyethylene

PVC

Protected steel

24 months

Type 2 LDAR survey

(design pressure > 16 bar)

Grey cast iron

Bitumen sheet

6 months

 

Asbestos

Ductile cast iron

12 months

 

Non-protected steel

Copper

24 months

 

Polyethylene

PVC

Protected steel

36 months

Type 2 LDAR survey

(design pressure ≤ 16 bar)

Grey cast iron

Bitumen sheet

6 months

 

Asbestos

Ductile cast iron

12 months

 

Non-protected steel

Copper

24 months

 

Polyethylene

PVC

Protected steel

36 months

Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.

LDAR surveys may be carried out using a two-step approach: first from a distance and, only where a leak is detected, via a second detection as close as possible to the source.

For underground and below-the-sea-level protected steel pipelines with design pressure above 16 bar, operators shall also perform risk-based preventive pipeline integrity management to prevent any leakage in accordance with relevant European standards or national pipeline integrity management legislation. Preventive pipeline integrity management shall include constant monitoring of flow, fluid composition, pressure and temperature of the gas transported in the system to ensure that those parameters correspond to the applicable pipeline integrity specifications, as well as to locate the source of potential methane emissions and to estimate them. Taking into account the results of that preventive pipeline integrity management, the competent authority may approve a different frequency of up to 36 months for a type 1 LDAR survey and up to 48 months for a type 2 LDAR survey.

1. Ħarsa ġenerali

,
Titlu Regolamentazzjoni

1.1 Referenzi

1.2 Rekwiżiti identifikati

1.3 Standards relatati

2. Rekwiżiti identifikati

Rekwiżiti
Sors Rekwiżit

3. Standards relatati

Standards
Sors Rekwiżit
  • Builddate: 15.07.2024 00:00:00 -Doknr: CELEX:32024R1787
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.