GRCA Planeth
Mintix illoggjat
Idħol
Bidu
Sorsi
›
CM-03 Configuration Change Control
›
Standard - CM-03(07) Review System Changes
+CM-03(07) Review System Changes
CM-03(07) Review System Changes
Control
Review changes to the system [Assignement: frequency] or when [Assignement: circumstances] to determine whether unauthorized changes have occurred.
Discussion
Indications that warrant a review of changes to the system and the specific circumstances justifying such reviews may be obtained from activities carried out by organizations during the configuration change process or continuous monitoring process.
Assessment Objective
changes to the system are reviewed [Assignement: frequency] or when [Assignement: circumstances] to determine whether unauthorized changes have occurred.
Assessment Method
Examine
Configuration management policy procedures addressing system configuration change control configuration management plan change control records system architecture and configuration documentation system configuration settings and associated documentation system audit records system component inventory system security plan other relevant documents or records
Interview
Organizational personnel with configuration change control responsibilities organizational personnel with security responsibilities system/network administrators members of change control board or similar
1. Ħarsa ġenerali
Titlu
Standard
1.1 Referenzi
1.2 Rekwiżiti identifikati
1.3 Regolamenti relatati
2. Rekwiżiti identifikati
Rekwiżiti
Sors
Rekwiżit
3. Regolamenti relatati
Regolamenti
Sors
Regolamentazzjoni
Kwistjonijiet marbuta
Links
Tip ta’ link
Kwistjoni
is blocked by
CM-03(07) Review System Changes – Assessment Procedure
is blocked by
Test, Validate & Document Changes
NIST
-
https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final