+Article 18 2. |
Article 18 2.The operator shall prepare a report documenting that the condition referred to in paragraph 1(a) has been met and shall submit it to the competent authority for the latter to approve the transfer of responsibility. This report shall demonstrate, at least:
(a)
the conformity of the actual behaviour of the injected CO2 with the modelled behaviour;
(b)
the absence of any detectable leakage;
(c)
that the storage site is evolving towards a situation of long-term stability. The Commission may adopt guidelines on the assessment of the matters referred to in points (a), (b) and (c) of the first subparagraph, highlighting therein any implications for the technical criteria relevant to the determination of the minimum periods referred to in paragraph 1(b). 1. Ħarsa ġenerali
1.1 Referenzi1.2 Rekwiżiti identifikati1.3 Standards relatati2. Rekwiżiti identifikati