+Article 6a 2. |
Article 6a 2.The framework referred to in paragraph 1 may ensure that flexible connection agreements specify at least the following:
(a)
the maximum firm injection and withdrawal of electricity from and to the grid, as well as the additional flexible injection and withdrawal capacity that can be connected and differentiated by time blocks throughout the year;
(b)
the network charges applicable to both the firm and flexible injection and withdrawal capacities;
(c)
the agreed duration of the flexible connection agreement and the expected date for granting connection to the entire requested firm capacity. The system user connecting through a flexible grid connection shall be required to install a power control system that is certified by an authorised certifier. 1. Ħarsa ġenerali