+Article 19 6.

Article 19 6.

The provisions in this Directive concerning smart metering systems shall apply to future installations and to installations that replace older smart meters. Smart metering systems that have already been installed, or for which the ‘start of works’ began, before 4 July 2019, may remain in operation over their lifetime but, in the case of smart metering systems that do not meet the requirements of Article 20 and Annex II, shall not remain in operation after 5 July 2031.

For the purpose of this paragraph, ‘start of works’ means either the start of construction works on the investment or the first firm commitment to order equipment or other commitment that makes the investment irreversible, whichever is the first in time. Buying of land and preparatory works such as obtaining permits and conducting preliminary feasibility studies are not considered as start of works. For take-overs, ‘start of works’ means the moment of acquiring the assets directly linked to the acquired establishment.

1. Ħarsa ġenerali

,
Titlu Regolamentazzjoni

1.1 Referenzi

1.2 Rekwiżiti identifikati

1.3 Standards relatati

2. Rekwiżiti identifikati

Rekwiżiti
Sors Rekwiżit

3. Standards relatati

Standards
Sors Rekwiżit