+CHAPTER 1 Prior written notification and consent
---+Article 4 Notification
---+Article 5 Contract
------+Article 5 1.
------+Article 5 2.
------+Article 5 3.
------+Article 5 4.
------+Article 5 5.
---+Article 6 Financial guarantee
------+Article 6 1.
------+Article 6 2.
------+Article 6 3.
------+Article 6 4.
------+Article 6 5.
------+Article 6 6.
------+Article 6 7.
------+Article 6 8.
------+Article 6 9.
---+Article 7 Transmission of the notification by the competent authority of dispatch
------+Article 7 1.
------+Article 7 2.
------+Article 7 3.
------+Article 7 4.
---+Article 8 Requests for information and documentation by the competent authorities concerned and acknowledgement by the competent authority of destination
------+Article 8 1.
------+Article 8 2.
------+Article 8 3.
---+Article 9 Consents by the competent authorities of destination, dispatch and transit and time periods for transport, recovery or disposal
------+Article 9 1.
------+Article 9 2.
------+Article 9 3.
------+Article 9 4.
------+Article 9 5.
------+Article 9 6.
------+Article 9 7.
------+Article 9 8.
------+Article 9 9.
---+Article 10 Conditions for a shipment
------+Article 10 1.
------+Article 10 2.
------+Article 10 3.
------+Article 10 4.
------+Article 10 5.
---+Article 11 Objections to shipments of waste destined for disposal
------+Article 11 1.
------+Article 11 2.
------+Article 11 3.
------+Article 11 4.
------+Article 11 5.
------+Article 11 6.
---+Article 12 Objections to shipments of waste destined for recovery
------+Article 12 1.
------+Article 12 2.
------+Article 12 3.
------+Article 12 4.
------+Article 12 5.
------+Article 12 6.
---+Article 13 General notification
------+Article 13 1.
------+Article 13 2.
------+Article 13 3.
---+Article 14 Pre-consented recovery facilities
------+Article 14 1.
------+Article 14 2.
------+Article 14 3.
------+Article 14 4.
------+Article 14 5.
---+Article 15 Additional provisions regarding interim recovery and disposal operations
---+Article 16 Requirements following consent to a shipment
---+Article 17 Changes in the shipment after consent
------+Article 17 1.
------+Article 17 2.
------+Article 17 3.
|
CHAPTER 1 Prior written notification and consent
CHAPTER 1 Prior written notification and consent
1. Overzicht
| Titel |
Regelgeving |
|
Article 4 Notification
|
Article 4
Where the notifier intends to ship waste as referred to in Article 3(1)(a) or (b), he/she shall submit a prior written notification to and through the competent authority of dispatch and, if submitting a general notification, comply with Article 13.
When a notification is submitted, the following requirements shall be fulfilled:
1.
notification and movement documents:
Notification shall be effected by means of the following documents:
(a)
the notification document set out in Annex IA; and
(b)
the movement document set out in Annex IB.
In submitting a notification, the notifier shall fill in the notification document and, where relevant, the movement document.
When the notifier is not the original producer in accordance with point 15(a)(i) of Article 2, the notifier shall ensure that this producer or one of the persons indicated in point 15(a)(ii) or (iii) of Article 2, where practicable, also signs the notification document set out in Annex IA.
The notification document and the movement document shall be issued to the notifier by the competent authority of dispatch;
2.
information and documentation in the notification and movement documents:
The notifier shall supply on, or annex to, the notification document information and documentation as listed in Annex II, Part 1. The notifier shall supply on, or annex to, the movement document information and documentation referred to in Annex II, Part 2, to the extent possible at the time of notification.
A notification shall be considered properly carried out when the competent authority of dispatch is satisfied that the notification document and movement document have been completed in accordance with the first subparagraph;
3.
additional information and documentation:
If requested by any of the competent authorities concerned, the notifier shall supply additional information and documentation. A list of additional information and documentation that may be requested is set out in Annex II, Part 3.
A notification shall be considered properly completed when the competent authority of destination is satisfied that the notification document and the movement document have been completed and that the information and documentation as listed in Annex II, Parts 1 and 2, as well as any additional information and documentation requested in accordance with this paragraph and as listed in Annex II, Part 3, have been supplied by the notifier;
4.
conclusion of a contract between the notifier and the consignee:
The notifier shall conclude a contract as described in Article 5 with the consignee for the recovery or disposal of the notified waste.
Evidence of this contract or a declaration certifying its existence in accordance with Annex IA shall be supplied to the competent authorities involved at the time of notification. A copy of the contract or such evidence to the satisfaction of the competent authority concerned shall be provided by the notifier or consignee upon request by the competent authority;
5.
establishment of a financial guarantee or equivalent insurance:
A financial guarantee or equivalent insurance shall be established as described in Article 6. A declaration to this effect shall be made by the notifier through completion of the appropriate part of the notification document set out in Annex IA.
The financial guarantee or equivalent insurance (or if the competent authority so allows, evidence of that guarantee or insurance or a declaration certifying its existence) shall be supplied as part of the notification document at the time of notification or, if the competent authority so allows, pursuant to national legislation, at such time before the shipment starts;
6.
Coverage of the notification:
A notification shall cover the shipment of waste from its initial place of dispatch and including its interim and non-interim recovery or disposal.
If subsequent interim or non-interim operations take place in a country other than the first country of destination, the non-interim operation and its destination shall be indicated in the notification and Article 15(f) shall apply.
Only one waste identification code shall be covered for each notification, except for:
(a)
wastes not classified under one single entry in either Annex III, IIIB, IV or IVA. In this case, only one type of waste shall be specified;
(b)
mixtures of wastes not classified under one single entry in either Annex III, IIIB, IV or IVA unless listed in Annex IIIA. In this case, the code for each fraction of the waste shall be specified in order of importance.
|
|
Article 5 Contract
|
|
|
Article 6 Financial guarantee
|
|
|
Article 7 Transmission of the notification by the competent authority of dispatch
|
|
|
Article 8 Requests for information and documentation by the competent authorities concerned and acknowledgement by the competent authority of destination
|
|
|
Article 9 Consents by the competent authorities of destination, dispatch and transit and time periods for transport, recovery or disposal
|
|
|
Article 10 Conditions for a shipment
|
|
|
Article 11 Objections to shipments of waste destined for disposal
|
|
|
Article 12 Objections to shipments of waste destined for recovery
|
|
|
Article 13 General notification
|
|
|
Article 14 Pre-consented recovery facilities
|
|
|
Article 15 Additional provisions regarding interim recovery and disposal operations
|
Article 15
Additional provisions regarding interim recovery and disposal operations
Shipments of waste destined for interim recovery or disposal operations shall be subject to the following additional provisions:
(a)
Where a shipment of waste is destined for an interim recovery or disposal operation, all the facilities where subsequent interim as well as non-interim recovery and disposal operations are envisaged shall also be indicated in the notification document in addition to the initial interim recovery or disposal operation.
(b)
The competent authorities of dispatch and destination may give their consent to a shipment of waste destined for an interim recovery or disposal operation only if there are no grounds for objection, in accordance with Articles 11 or 12, to the shipment(s) of waste to the facilities performing any subsequent interim or non-interim recovery or disposal operations.
(c)
Within three days of the receipt of the waste by the facility which carries out this interim recovery or disposal operation, that facility shall provide confirmation in writing that the waste has been received.
This confirmation shall be supplied on, or annexed to, the movement document. The said facility shall send signed copies of the movement document containing this confirmation to the notifier and to the competent authorities concerned.
(d)
As soon as possible, but no later than 30 days after completion of the interim recovery or disposal operation, and no later than one calendar year, or a shorter period in accordance with Article 9(7), following the receipt of the waste, the facility carrying out this operation shall, under its responsibility, certify that the interim recovery or disposal has been completed.
This certificate shall be contained in, or annexed to, the movement document.
The said facility shall send signed copies of the movement document containing this certificate to the notifier and to the competent authorities concerned.
(e)
When a recovery or disposal facility which carries out an interim recovery or disposal operation delivers the waste for any subsequent interim or non-interim recovery or disposal operation to a facility located in the country of destination, it shall obtain as soon as possible but no later than one calendar year following delivery of the waste, or a shorter period in accordance with Article 9(7), a certificate from that facility that the subsequent non-interim recovery or disposal operation has been completed.
The said facility that carries out an interim recovery or disposal operation shall promptly transmit the relevant certificate(s) to the notifier and the competent authorities concerned, identifying the shipment(s) to which the certificate(s) pertain.
(f)
When a delivery as described in subparagraph (e) is made to a facility respectively located:
(i)
in the initial country of dispatch or in another Member State, a new notification shall be required in accordance with the provisions of this Title, or
(ii)
in a third country, a new notification shall be required in accordance with the provisions of this Regulation, with the addition that the provisions concerning the competent authorities concerned shall also apply to the initial competent authority of the initial country of dispatch.
|
|
Article 16 Requirements following consent to a shipment
|
Article 16
Requirements following consent to a shipment
After consent has been given to a notified shipment by the competent authorities involved, all undertakings involved shall complete the movement document, or, in the case of a general notification, the movement documents at the points indicated, sign it or them and retain a copy or copies. The following requirements shall be fulfilled:
(a)
Completion of the movement document by the notifier: once the notifier has received consent from the competent authorities of dispatch, destination and transit or, in relation to the competent authority of transit, can assume tacit consent, he/she shall insert the actual date of shipment and otherwise complete the movement document to the extent possible.
(b)
Prior information regarding actual start of shipment: the notifier shall send signed copies of the then completed movement document, as described in point (a), to the competent authorities concerned and to the consignee at least three working days before the shipment starts.
(c)
Documents to accompany each transport: the notifier shall retain a copy of the movement document. The movement document and copies of the notification document containing the written consents and the conditions of the competent authorities concerned shall accompany each transport. The movement document shall be retained by the facility which receives the waste.
(d)
Written confirmation of receipt of the waste by the facility: within three days of receipt of the waste, the facility shall provide confirmation in writing that the waste has been received.
This confirmation shall be contained in, or annexed to, the movement document.
The facility shall send signed copies of the movement document containing this confirmation to the notifier and to the competent authorities concerned.
(e)
Certificate for non-interim recovery or disposal by the facility: as soon as possible, but no later than 30 days after completion of the non-interim recovery or disposal operation, and no later than one calendar year, or a shorter period in accordance with Article 9(7), following receipt of the waste, the facility carrying out the operation shall, under its responsibility, certify that the non-interim recovery or disposal has been completed.
This certificate shall be contained in, or annexed to, the movement document.
The facility shall send signed copies of the movement document containing this certificate to the notifier and to the competent authorities concerned.
|
|
Article 17 Changes in the shipment after consent
|
|
,
1.1 Referenties
1.2 Geïdentificeerde eisen
1.3 Gerelateerde standaarden
2. Geïdentificeerde eisen
3. Gerelateerde standaarden
|