+Article 26 7.

Article 26 7.

In order to assess the economic feasibility of increasing energy efficiency of heat and cooling supply, Member States shall ensure that an installation level cost-benefit analysis in accordance with Annex XI is carried out where the following installations are newly planned or substantially refurbished:

(a) 

a thermal electricity generation installation with an average annual total energy input exceeding 10 MW, in order to assess the cost and benefits of providing for the operation of the installation as a high-efficiency cogeneration installation;

(b) 

an industrial installation with an average annual total energy input exceeding 8 MW in order to assess utilisation of the waste heat on-site and off-site;

(c) 

a service facility with an annual average total energy input exceeding 7 MW, such as wastewater treatment facilities and LNG facilities, in order to assess utilisation of waste heat on-site and off-site;

(d) 

a data centre with a total rated energy input exceeding 1 MW level in order to assess the cost and benefit analysis, including, but not limited to, technical feasibility, cost-efficiency and the impact on energy efficiency and local heat demand, including seasonal variation, of utilising the waste heat to satisfy economically justified demand, and of the connection of that installation to a district heating network or an efficient/RES-based district cooling system or other waste heat recovery applications.

The analysis referred to in the first subparagraph, point (d), shall consider cooling system solutions that allow removing or capturing the waste heat at useful temperature level with minimal ancillary energy inputs.

Member States shall aim to remove barriers for the utilisation of waste heat and provide support for the uptake of waste heat where the installations are newly planned or refurbished.

The fitting of equipment to capture carbon dioxide produced by a combustion installation with a view to it being geologically stored as provided for in Directive 2009/31/EC shall not be considered as refurbishment for the purpose of points (b) and (c) of this paragraph.

Member States shall require the cost-benefit analysis to be carried out in cooperation with the companies responsible for the operation of the facility.

1. Overzicht

,
Titel Regelgeving

1.1 Referenties

1.2 Geïdentificeerde eisen

1.3 Gerelateerde standaarden

2. Geïdentificeerde eisen

Eisen
Bron Eis

3. Gerelateerde standaarden

Standaarden
Bron Eis