+ANNEX IX Emergency measures to be considered for inclusion in the short-term action plans required under Article 20

ANNEX IX Emergency measures to be considered for inclusion in the short-term action plans required under Article 20

ANNEX IX

Emergency measures to be considered for inclusion in the short-term action plans required under Article 20

Measures to be considered in the short term aimed at addressing the sources which contribute to the risk of the alert threshold being exceeded, depending on local circumstances and on the pollutant considered:

(a)

restricting the circulation of vehicles, specifically around locations frequented by sensitive population and vulnerable groups;

(b)

low-fare or fare-free public transportation;

(c)

suspending operations at construction works;

(d)

street cleaning;

(e)

flexible work arrangements.

1. Overzicht

,
Titel Regelgeving

1.1 Referenties

1.2 Geïdentificeerde eisen

1.3 Gerelateerde standaarden

2. Geïdentificeerde eisen

Eisen
Bron Eis

3. Gerelateerde standaarden

Standaarden
Bron Eis