+Article 12 5.
|
Article 12 5.
When considered necessary by the competent authority, in order to fulfil relevant environmental requirements set out in Community legislation, in particular those in Directives 76/464/EEC, 80/68/EEC and 2000/60/EC, following closure of a waste facility, the operator shall, inter alia, control the physical and chemical stability of the facility and minimise any negative environmental effect, in particular with respect to surface and groundwater, by ensuring that:
(a)
all the structures pertaining to the facility are monitored and conserved, with control and measuring apparatus always ready for use;
(b)
where applicable, overflow channels and spillways are kept clean and free.
1. Przegląd
1.1 Odwołania
1.2 Zidentyfikowane wymagania
1.3 Powiązane normy
2. Zidentyfikowane wymagania
Wymagania
| Źródło |
Wymaganie |
3. Powiązane normy
- Builddate: 07.08.2009 00:00:00 -Doknr: CELEX:32006L0021
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|