GRCA Planeth
Nie jesteś zalogowany
Zaloguj się
Start
Źródła
›
CP-10 System Recovery and Reconstitution
›
Standard - CP-10(04) Restore Within Time Period
+CP-10(04) Restore Within Time Period
CP-10(04) Restore Within Time Period
Control
Provide the capability to restore system components within [Assignement: restoration time periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components.
Discussion
Restoration of system components includes reimaging, which restores the components to known, operational states.
Assessment Objective
the capability to restore system components within [Assignement: restoration time periods] from configuration-controlled and integrity-protected information representing a known, operational state for the components is provided.
Assessment Method
Examine
Contingency planning policy procedures addressing system recovery and reconstitution contingency plan system design documentation system configuration settings and associated documentation contingency plan test documentation contingency plan test results evidence of system recovery and reconstitution operations system security plan other relevant documents or records
Interview
Organizational personnel with system recovery and reconstitution responsibilities organizational personnel with information security responsibilities
1. Przegląd
Tytuł
Norma
1.1 Odwołania
1.2 Zidentyfikowane wymagania
1.3 Powiązane regulacje
2. Zidentyfikowane wymagania
Wymagania
Źródło
Wymaganie
3. Powiązane regulacje
Regulacje
Źródło
Regulacja
Powiązane zgłoszenia
Powiązania
Typ powiązania
Zgłoszenie
is blocked by
CP-10(04) Restore Within Time Period – Assessment Procedure
is blocked by
Restore Within Time Period
is blocked by
Recovery Images
NIST
-
https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final