In spite of high levels of service security, power supply disruptions still occur regularly at power distribution system operators or power supply companies. Most of these malfunctions are so short (less than one second long) that consumers do not even notice them. However, interruptions lasting longer than 10 ms can cause disruptions to IT operations. In addition to malfunctions in the power supply system, however, switching off equipment when performing scheduled maintenance or cables damaged by excavation work can also cause the power supply to be disrupted.

Note that not only the obvious, direct consumers of electricity (PCs, lighting, etc.) depend on the power supply. Much infrastructural equipment used today depends directly or indirectly on electrical power, e.g. lifts, air conditioning technology, alarm systems, security gates, automatic door closing units and sprinkler systems. Even the water supply in high-rise buildings relies on electricity to generate water pressure on the upper floors using pumps. If the power supply disruptions occur over longer periods of time, disruption of infrastructural equipment can mean that no more activities can be carried out in the affected areas.

Apart from disruptions, other malfunctions of the power supply can also impair operations. Overvoltage, for example, can result in malfunctions or even damage to electrical devices.

It must also be noted that the organisation's own business processes may also be affected by disruptions or malfunctions of the power supply in the neighbourhood under certain circumstances, for example if access roads are blocked.

Examples:

Powiązane zgłoszenia

Powiązania
Typ powiązania Zgłoszenie
is blocked by SYS.1.1.A15 Stable and Uninterruptible Power Supply [Building Services] (S)
is blocked by SYS.1.8.A1 Appropriate Installation of Storage Systems [Building Services] (B)
is blocked by SYS.4.4.A6 Integration of IoT Devices into Organisation Security Policies (S)
is blocked by SYS.4.4.A7 Planning the Use of IoT Devices (S)
is blocked by SYS.4.4.A9 Controlling the Use of IoT Devices (S)
is blocked by SYS.4.4.A21 Operational Environment and Power Supply [Building Services] (H)
is blocked by IND.2.1.A7 Creating Backups [OT Operations] (S)
is blocked by IND.2.1.A19 Security Tests [OT Operations] (H)
is blocked by NET.3.2.A23 System Monitoring and Evaluation (S)
is blocked by NET.3.2.A29 Use of High-Availability Solutions (H)
is blocked by NET.4.3.A12 Blocking Specific Recipient and Sender Fax Numbers (H)
is blocked by NET.4.3.A13 Designating Authorised Fax Operators [User] (H)
is blocked by INF.1.A1 Planning the Building Protection [Planner] (B)
is blocked by INF.1.A2 Appropriate Segmentation of Circuits (B)
is blocked by INF.1.A13 Regulations Governing Access to Distributors (S)
is blocked by INF.1.A14 Lightning Protection Devices (S)
is blocked by INF.1.A15 Plans Detailing the Location of Supply Lines (S)
is blocked by INF.1.A36 Regular Documentation Updates (S)
is blocked by INF.1.A25 Selection of Appropriate Locations [Top Management] (A)
is blocked by INF.1.A30 Selection of an Appropriate Building (H)
is blocked by INF.2.A2 Formation of Fire Zones [Planner] (B)
is blocked by INF.2.A3 Use of an Uninterruptible Power Supply [Building Services] (B)
is blocked by INF.2.A4 Emergency Shutdown of the Power Supply [Building Services] (B)
is blocked by INF.2.A8 Use of a Fire Alarm System [Planner] (B)
is blocked by INF.2.A9 Use of an Extinguishing or Fire Prevention System [Building Services] (B)
is blocked by INF.2.A10 Inspection and Maintenance of Infrastructure [Maintenance Personnel, Building Services] (B)
is blocked by INF.2.A17 Use of Early Fire Detection [Planner, Building Services] (B)
is blocked by INF.2.A13 Planning and Installation of Alarm Systems [Building Services] (S)
is blocked by INF.2.A14 Use of an Emergency Power System [Planner, Building Services] (S)
is blocked by INF.2.A19 Functional Testing of Technical Infrastructure [Building Services] (S)
is blocked by INF.2.A30 Systems for Extinguishing or Preventing Fires [Building Services, Planner] (S)
is blocked by INF.2.A21 Alternate Data Centre (H)
is blocked by INF.2.A23 Appropriate Design of Data Centre Cabling [Building Services] (H)
is blocked by INF.2.A25 Redundant Design of Uninterruptible Power Supplies [Planner] (H)
is blocked by INF.2.A26 Redundant Design of Emergency Power Systems [Planner] (H)
is blocked by INF.2.A28 Use of Higher-Level Alarm Systems [Planner] (H)
is blocked by INF.5.A4 Protection Against Intrusion [Planner, Building Services] (B)
is blocked by INF.5.A6 Minimising Fire Loads [Employee, Planner] (B)
is blocked by INF.5.A9 Power Supply [Building Services] (B)
is blocked by INF.5.A8 Avoidance of Uncontrolled Electrostatic Discharge [Planner] (S)
is blocked by INF.5.A11 Avoidance of Pipes with Hazardous Liquids and Gases [Planner, Building Services] (S)
is blocked by INF.5.A12 Protection Against Accidental Damage to Supply Lines [Planner] (S)
is blocked by INF.5.A14 Minimising Fire Hazards from Neighbouring Areas [Planner, Building Services] (S)
is blocked by INF.5.A15 Lightning and Overvoltage Protection [Planner, Building Services] (S)
is blocked by INF.5.A16 Use of an Uninterruptible Power Supply [Building Services] (S)
is blocked by INF.5.A17 Inspection and Maintenance of Infrastructure [Building Services, IT Operation Department, Maintenance Personnel] (S)
is blocked by INF.5.A19 Redundancy of the Technical Infrastructure Room [Planner] (H)
is blocked by INF.5.A20 Enhanced Protection Against Intrusion and Sabotage [Planner] (H)
is blocked by INF.5.A22 Redundant Power Supply Design [Planner] (H)
is blocked by INF.5.A23 Emergency Power Systems [Planner, Building Services, Maintenance Personnel] (H)
is blocked by INF.5.A24 Ventilation and Cooling [Planner, Building Services, Maintenance Personnel] (H)
is blocked by INF.5.A25 Increased Protection Against Fire and Smoke Damage [Planner] (H)
is blocked by INF.5.A26 Monitoring of the Power Supply [Planner, Building Services] (H)
is blocked by INF.12.A1 Selection of Appropriate Cable Types [IT Operation Department, Building Services] (B)
is blocked by INF.12.A2 Planning Cable Routing [IT Operation Department, Building Services] (B)
is blocked by INF.12.A3 Proper Installation [IT Operation Department, Building Services] (B)
is blocked by INF.12.A4 EMC-Compliant Power Supply [Building Services] (B)
is blocked by INF.12.A5 Requirements Analysis for Cabling [IT Operation Department, Building Services] (S)
is blocked by INF.12.A6 Cabling Approval [IT Operation Department, Building Services] (S)
is blocked by INF.12.A7 Overvoltage Protection [Building Services] (S)
is blocked by INF.12.A8 Removing and Disabling Cables No Longer Required [IT Operation Department, Building Services] (S)
is blocked by INF.12.A9 Fire Prevention in Trays [Building Services] (S)
is blocked by INF.12.A10 Documentation and Labelling of Cabling [IT Operation Department, Building Services] (S)
is blocked by INF.12.A11 Neutral Documentation in Distributors [IT Operation Department, Building Services] (S)
is blocked by INF.12.A12 Inspection of Electrical Installations and Existing Connections [IT Operation Department, Building Services] (S)
is blocked by INF.12.A13 Avoidance of Electrical Ignition Sources [Building Services] (S)
is blocked by INF.12.A14 A-B Supply [Building Services] (B)
is blocked by INF.12.A15 Material Protection of Cabling [IT Operation Department, Building Services] (H)
is blocked by INF.12.A16 Use of Cabinet Systems [Building Services] (H)
is blocked by INF.12.A17 Redundancies for IT Cabling [IT Operation Department] (H)