Sabotage refers to the intentional manipulation or damaging of objects or processes with the aim of inflicting damage on the victim. Computer centres or communications links owned by public authorities or companies make particularly attractive targets, since a dramatic effect can be achieved here with a relatively low effort.
The complex infrastructure of a computer centre can be selectively manipulated by external attackers, and particularly by insiders, by attacking specific, important components with the goal of disrupting operations. Here, inadequately protected building management systems and communication infrastructures, as well as central supply points are subject to a particular risk, which may not be monitored organisationally or technically and provide outsiders with easy and unobtrusive access.
Examples:
In a large computer centre, manipulation of the UPS resulted in a temporary total power failure. The perpetrator had repeatedly switched the UPS to the bypass mode manually and then tampered with the main power supply to the building. There were are total of four blackouts over a period of three years. In some cases, this even resulted in damage to hardware. The service outages lasted between 40 and 130 minutes. Sanitary facilities were also available in a computer centre. By blocking the drains and turning on all taps at the same time, water penetrated into central technical components. The damage caused in this manner resulted in disruptions to the operation of the production system. Sabotage poses a special risk to electronic archives since a large number of documents requiring protection are stored in a small amount of space. In this way, it is possible to cause extensive damage with just minor, selective tampering under some circumstances.
Powiązane zgłoszenia
Powiązania
Typ powiązania
Zgłoszenie
is blocked by
ORP.2.A14 Tasks and Responsibilities of Employees [Supervisor] (B)
is blocked by
CON.8.A5 Secure System Design (B)
is blocked by
CON.8.A11 Drawing Up a Policy for Software Development (S)
is blocked by
CON.8.A16 Appropriate Control of Software Development (S)
is blocked by
OPS.1.1.6.A7 Selecting Software Testers [Human Resources Department, Process Owner] (S)
is blocked by
OPS.2.2.A19 Security Vetting of Employees [Human Resources Department] (H)
is blocked by
OPS.3.1.A16 Security Vetting of Employees [Human Resources Department] (H)
is blocked by
DER.2.3.A1 Creation of a Management Committee (B)
is blocked by
DER.2.3.A2 Deciding on a Cleaning Strategy (B)
is blocked by
DER.2.3.A4 Blocking and Changing Access Data and Cryptographic Keys (B)
is blocked by
DER.2.3.A5 Closing the Initial Entry Route (B)
is blocked by
DER.2.3.A7 Targeted System Hardening (S)
is blocked by
DER.2.3.A9 Hardware Replacement in Affected IT Systems (H)
is blocked by
DER.2.3.A10 Modifications to Help Thwart a Repeat Attack (H)
is blocked by
SYS.1.2.2.A3 Secure Administration of Windows Server 2012 (B)
is blocked by
SYS.1.2.2.A6 Secure Authentication and Authorisation in Windows Server 2012 (S)
is blocked by
SYS.1.2.2.A11 Attack Detection in Windows Server 2012 (H)
is blocked by
SYS.3.2.3.A1 Strategy for Using iOS Devices (B)
is blocked by
SYS.3.2.3.A7 Preventing Unauthorised Deletion of Configuration Profiles (B)
is blocked by
SYS.3.2.3.A12 Using Apple IDs (S)
is blocked by
SYS.3.2.3.A13 Using the “iOS Restrictions” Configuration Option (S)
is blocked by
SYS.3.2.3.A21 Installation of Apps and Integration of the Apple App Store (S)
is blocked by
SYS.3.2.3.A26 No Connections to Host Systems (H)
is blocked by
SYS.3.2.4.A2 Disabling Developer Options (S)
is blocked by
IND.1.A3 Protection Against Malware (B)
is blocked by
IND.1.A9 Restrictive Use of Removable Media and Mobile Devices in ICS Environments (S)
is blocked by
IND.1.A10 Monitoring, Logging, and Detection [OT Operations] (S)
is blocked by
IND.1.A12 Establishing Vulnerability Management (S)
is blocked by
IND.1.A13 Contingency Planning for OT (H)
is blocked by
IND.1.A16 Stronger Compartmentalisation of Zones (H)
is blocked by
IND.2.1.A1 Restriction of Access to Configuration and Maintenance Interfaces [OT Operations] (B)
is blocked by
IND.2.1.A2 Using Secure Transmission Protocols for Configuration and Maintenance [Maintenance Personnel, OT Operations] (B)
is blocked by
IND.2.1.A4 Disabling or Uninstalling Unused Services, Functions, and Interfaces [Maintenance Personnel, OT Operations] (B)
is blocked by
IND.2.1.A6 Network Segmentation [OT Operations, Planner] (B)
is blocked by
IND.2.1.A7 Creating Backups [OT Operations] (S)
is blocked by
IND.2.1.A11 Maintenance of ICS Components [Employee, OT Operations, Maintenance Personnel] (S)
is blocked by
IND.2.1.A13 Appropriate Commissioning of ICS Components [OT Operations] (S)
is blocked by
IND.2.1.A16 Protecting External Interfaces [OT Operations] (S)
is blocked by
IND.2.1.A17 Use of Secure Protocols for the Transmission of Measurement and Control Data [OT Operations] (S)
is blocked by
IND.2.1.A19 Security Tests [OT Operations] (H)
is blocked by
IND.2.2.A1 Extended System Documentation for Programmable Logic Controllers [OT Operations] (S)
is blocked by
IND.2.7.A1 Recording and Documentation [Planner, Maintenance Personnel] (B)
is blocked by
IND.2.7.A2 Specified Use of Hardware and Software Components [Maintenance Personnel] (B)
is blocked by
IND.2.7.A3 Changing the Application Program on the Logic System [Maintenance Personnel] (B)
is blocked by
IND.2.7.A4 Making Information Security an Integral Part of Functional Safety Management [ICS Information Security Officer] (S)
is blocked by
IND.2.7.A5 SIS Business Continuity Management [ICS Information Security Officer] (S)
is blocked by
IND.2.7.A6 Secure Planning and Specification of SIS [Planner, Maintenance Personnel, ICS Information Security Officer] (S)
is blocked by
IND.2.7.A7 Separation and Independence of the SIS from the Environment [Planner, Maintenance Personnel] (S)
is blocked by
IND.2.7.A8 Secure Transfer of Engineering Data to SIS [Planner, Maintenance Personnel, ICS Information Security Officer] (S)
is blocked by
IND.2.7.A9 Protection of Data and Signal Connections [Planner, Maintenance Personnel, ICS Information Security Officer] (S)
is blocked by
IND.2.7.A10 Displays and Alerts Pertaining to Simulated or Bridged Variables [Planner] (S)
is blocked by
IND.2.7.A11 Dealing with Integrated Systems [Planner, Maintenance Personnel, ICS Information Security Officer] (S)
is blocked by
IND.2.7.A12 Ensuring the Integrity and Authenticity of Application Programs and Configuration Data [Planner] (H)
is blocked by
IND.3.2.A10 Observation and Control of OT Remote Maintenance Sessions (S) [Employee]
is blocked by
NET.3.2.A2 Definition of Firewall Rules (B)
is blocked by
NET.3.2.A3 Configuring Appropriate Filter Rules on the Packet Filter (B)
is blocked by
NET.3.2.A4 Secure Firewall Configuration (B)
is blocked by
NET.3.2.A6 Protection of Administration Interfaces (B)
is blocked by
NET.3.2.A8 Prevention of Dynamic Routing (B)
is blocked by
NET.3.2.A9 Logging (B)
is blocked by
NET.3.2.A10 Protection Against Fragmentation Attacks on the Packet Filter (B)
is blocked by
NET.3.2.A19 Protection Against TCP SYN Flooding, UDP Packet Storms, and Sequence Number Guessing on the Packet Filter (S)
is blocked by
NET.3.2.A21 Temporary Decryption of Data Traffic (S)
is blocked by
NET.3.2.A22 Secure Time Synchronisation (S)
is blocked by
NET.3.2.A23 System Monitoring and Evaluation (S)
is blocked by
NET.3.2.A24 Audits and Penetration Tests (S)
is blocked by
NET.3.2.A28 Central Filtering of Active Content (H)
is blocked by
INF.2.A12 Data Centre Perimeter Protection [Planner, Building Services] (S)
is blocked by
INF.2.A13 Planning and Installation of Alarm Systems [Building Services] (S)
is blocked by
INF.2.A23 Appropriate Design of Data Centre Cabling [Building Services] (H)
is blocked by
INF.2.A24 Use of Video Monitoring Systems [Data Protection Officer, Building Services, Planner] (H)
is blocked by
INF.2.A28 Use of Higher-Level Alarm Systems [Planner] (H)
is blocked by
INF.5.A3 Site Access Regulations and Control [Building Services, IT Operation Department] (B)
is blocked by
INF.5.A4 Protection Against Intrusion [Planner, Building Services] (B)
is blocked by
INF.5.A12 Protection Against Accidental Damage to Supply Lines [Planner] (S)
is blocked by
INF.5.A17 Inspection and Maintenance of Infrastructure [Building Services, IT Operation Department, Maintenance Personnel] (S)
is blocked by
INF.5.A20 Enhanced Protection Against Intrusion and Sabotage [Planner] (H)
is blocked by
INF.8.A1 Securing Official Documents at the Home Workplace (B)
is blocked by
INF.8.A3 Protection Against Unauthorised Access to the Home Workplace (B)
is blocked by
INF.8.A4 Suitable Configuration of the Home Workplace (S)
is blocked by
INF.8.A6 Handling Official Documents with Increased Protection Needs at the Home Workplace (H)
is blocked by
INF.10.A3 Closed Windows and Doors [Employee] (B)
is blocked by
INF.10.A4 Planning Meeting, Event, and Training Rooms (S)
is blocked by
INF.10.A6 Configuring Secure Network Access [IT Operation Department] (S)
is blocked by
INF.10.A7 Secure Configuration of Training and Presentation Computers [IT Operation Department] (S)
is blocked by
INF.10.A8 Creating a Proof of Use for Rooms (S)
is blocked by
INF.10.A9 Resetting Training and Presentation Computers [IT Operation Department] (H)
is blocked by
INF.12.A2 Planning Cable Routing [IT Operation Department, Building Services] (B)
is blocked by
INF.12.A3 Proper Installation [IT Operation Department, Building Services] (B)
is blocked by
INF.12.A5 Requirements Analysis for Cabling [IT Operation Department, Building Services] (S)
is blocked by
INF.12.A6 Cabling Approval [IT Operation Department, Building Services] (S)
is blocked by
INF.12.A15 Material Protection of Cabling [IT Operation Department, Building Services] (H)
is blocked by
INF.12.A16 Use of Cabinet Systems [Building Services] (H)
is blocked by
INF.12.A17 Redundancies for IT Cabling [IT Operation Department] (H)
is blocked by
INF.13.A11 Adequate Hardening of Systems in TBM (S)
is blocked by
INF.13.A12 Secure Configuration of TBM Systems (S)
is blocked by
INF.13.A13 Secure Connection of Restricted Trusted Systems in TBM (S) [Planner]
is blocked by
INF.13.A26 Securing BIM (H) [Planner]