+Article 5 1

Article 5 1

1.   On the basis of a preliminary flood risk assessment as referred to in Article 4, Member States shall, for each river basin district, or unit of management referred to in Article 3(2)(b), or portion of an international river basin district lying within their territory, identify those areas for which they conclude that potential significant flood risks exist or might be considered likely to occur.

1. Przegląd

,
Tytuł Regulacja

1.1 Odwołania

1.2 Zidentyfikowane wymagania

1.3 Powiązane normy

2. Zidentyfikowane wymagania

Wymagania
Źródło Wymaganie

3. Powiązane normy

Normy
Źródło Wymaganie