+CHAPTER III SPECIAL PROVISIONS FOR COMBUSTION PLANTS
---+Article 28 Scope
---+Article 29 Aggregation rules
------+Article 29 1.
------+Article 29 2.
------+Article 29 3.
---+Article 30 Emission limit values
------+Article 30 1.
------+Article 30 2.
------+Article 30 3.
------+Article 30 4.
------+Article 30 5.
------+Article 30 6.
------+Article 30 7.
------+Article 30 8.
------+Article 30 9.
---+Article 31 Desulphurisation rate
------+Article 31 1.
------+Article 31 2.
------+Article 31 3.
---+Article 32 Transitional National Plan
------+Article 32 1.
------+Article 32 2.
------+Article 32 3.
------+Article 32 4.
------+Article 32 5.
------+Article 32 6.
---+Article 33 Limited life time derogation
------+Article 33 1.
------+Article 33 2.
------+Article 33 3.
------+Article 33 4.
---+Article 34 Small isolated systems
------+Article 34 1.
------+Article 34 2.
------+Article 34 3.
---+Article 34a Combustion plants that are part of a small isolated system
------+Article 34a 1.
------+Article 34a 2.
------+Article 34a 3.
------+Article 34a 4.
------+Article 34a 5.
------+Article 34a 6.
---+Article 35 District heating plants
------+Article 35 1.
------+Article 35 2.
---+Article 36 Geological storage of carbon dioxide
------+Article 36 1.
------+Article 36 2.
---+Article 37 Malfunction or breakdown of the abatement equipment
------+Article 37 1.
------+Article 37 2.
---+Article 38 Monitoring of emissions into air
------+Article 38 1.
------+Article 38 2.
------+Article 38 3.
------+Article 38 4.
---+Article 39 Compliance with emission limit values
---+Article 40 Multi-fuel firing combustion plants
------+Article 40 1.
------+Article 40 2.
------+Article 40 3.
---+Article 41 Implementing rules

CHAPTER III SPECIAL PROVISIONS FOR COMBUSTION PLANTS

CHAPTER III SPECIAL PROVISIONS FOR COMBUSTION PLANTS

1. Przegląd

,
Tytuł Regulacja
Article 28 Scope

Article 28

Scope

This Chapter shall apply to combustion plants, the total rated thermal input of which is equal to or greater than 50 MW, irrespective of the type of fuel used.

This Chapter shall not apply to the following combustion plants:

(a) 

plants in which the products of combustion are used for the direct heating, drying, or any other treatment of objects or materials;

(b) 

post-combustion plants designed to purify the waste gases by combustion which are not operated as independent combustion plants;

(c) 

facilities for the regeneration of catalytic cracking catalysts;

(d) 

facilities for the conversion of hydrogen sulphide into sulphur;

(e) 

reactors used in the chemical industry;

(f) 

coke battery furnaces;

(g) 

cowpers;

(h) 

any technical apparatus used in the propulsion of a vehicle, ship or aircraft;

(i) 

gas turbines and gas engines used on offshore platforms;

(j) 

plants which use any solid or liquid waste as a fuel other than waste referred to in point (b) of point 31 of Article 3.

Article 29 Aggregation rules
Article 30 Emission limit values
Article 31 Desulphurisation rate
Article 32 Transitional National Plan
Article 33 Limited life time derogation
Article 34 Small isolated systems
Article 34a Combustion plants that are part of a small isolated system
Article 35 District heating plants
Article 36 Geological storage of carbon dioxide
Article 37 Malfunction or breakdown of the abatement equipment
Article 38 Monitoring of emissions into air
Article 39 Compliance with emission limit values

Article 39

Compliance with emission limit values

The emission limit values for air shall be regarded as being complied with if the conditions set out in Part 4 of Annex V are fulfilled.

Article 40 Multi-fuel firing combustion plants
Article 41 Implementing rules

Article 41

Implementing rules

Implementing rules shall be established concerning:

(a) 

the determination of the start-up and shut-down periods referred to in point 27 of Article 3 and in point 1 of Part 4 of Annex V; and

(b) 

the transitional national plans referred to in Article 32 and, in particular, the setting of emission ceilings and related monitoring and reporting.

Those implementing rules shall be adopted in accordance with the regulatory procedure referred to in Article 75(2). The Commission shall make appropriate proposals not later than 7 July 2011.

1.1 Odwołania

1.2 Zidentyfikowane wymagania

1.3 Powiązane normy

2. Zidentyfikowane wymagania

Wymagania
Źródło Wymaganie

3. Powiązane normy

Normy
Źródło Wymaganie