+Article 5 6.

Article 5 6.

The Commission is empowered to adopt implementing acts to specify:

(a) 

methodologies for the identification of the measures referred to in point 3 of Annex V;

(b) 

methodologies for the determination of alternative indicators to verify whether the indicative objective of pollution reduction referred to in point 2 (a) of Annex V is achieved;

(c) 

the format in which integrated urban wastewater management plans are to be made available to the Commission where requested in accordance with paragraph 4.

Those implementing acts shall be adopted by 2 January 2028 in accordance with the examination procedure referred to in Article 28(2).

1. Przegląd

,
Tytuł Regulacja

1.1 Odwołania

1.2 Zidentyfikowane wymagania

1.3 Powiązane normy

2. Zidentyfikowane wymagania

Wymagania
Źródło Wymaganie

3. Powiązane normy

Normy
Źródło Wymaganie