|
+Article 8 1. |
Article 8 1.Member States shall ensure that discharges from urban wastewater treatment plants treating urban wastewater with a load of 150 000 p.e. and above satisfy, before being discharged into receiving waters, the relevant requirements of quaternary treatment set out in Part B and Table 3 of Annex I in accordance with the methods of monitoring and evaluation of results laid down in Part C of Annex I by:
(a)
31 December 2033 for discharges from 20 % of those urban wastewater treatment plants;
(b)
31 December 2039 for discharges from 60 % of those urban wastewater treatment plants;
(c)
31 December 2045 for all discharges from those urban wastewater treatment plants. The maximum permitted number of samples which fail to conform to the parametric values of Table 3 of Annex I is set out in Part C and Table 4 of Annex I. 1. Przegląd
1.1 Odwołania1.2 Zidentyfikowane wymagania1.3 Powiązane normy2. Zidentyfikowane wymagania
3. Powiązane normy
|