+Article 11 2.

Article 11 2.

Member States shall ensure that, at national level, the total annual energy from renewable sources, as defined in Article 2(1) of Directive (EU) 2018/2001, generated on-site or off-site by or on behalf of the owners or the operators of urban wastewater treatment plants treating a load of 10 000 p.e. and above, and irrespective of whether that energy is used on-site or off-site by the owners or operators of those plants, is equivalent to at least:

(a) 

20 % of the total annual energy used by such plants by 31 December 2030;

(b) 

40 % of the total annual energy used by such plants by 31 December 2035;

(c) 

70 % of the total annual energy used by such plants by 31 December 2040;

(d) 

100 % of the total annual energy used by such plants by 31 December 2045.

Renewable energy generated by or on behalf of the owners or operators of the urban wastewater treatment plant shall not comprise purchased renewable energy.

1. Przegląd

,
Tytuł Regulacja

1.1 Odwołania

1.2 Zidentyfikowane wymagania

1.3 Powiązane normy

2. Zidentyfikowane wymagania

Wymagania
Źródło Wymaganie

3. Powiązane normy

Normy
Źródło Wymaganie