|
+Article 26 1 |
Article 26 11. The Network Manager shall, for each reference period, draw up, in accordance with the cooperative decision-making process referred to in Article 38(11), a draft Network Performance Plan. The draft Network Performance Plan shall be drawn up after the setting of Union-wide performance targets and before the start of the reference period concerned. It shall contain performance targets in the key performance areas referred to in Article 21(3), point (a). 1. Przegląd
1.1 Odwołania1.2 Zidentyfikowane wymagania1.3 Powiązane normy2. Zidentyfikowane wymagania
3. Powiązane normy
|