+Article 36 1.

Article 36 1.

By 5 January 2020 the ENTSO for Electricity shall submit to ACER a proposal specifying which transmission system operators, bidding zones, bidding zone borders, capacity calculation regions and outage coordination regions are covered by each of the system operation regions. The proposal shall take into account the grid topology, including the degree of interconnection and of interdependency of the electricity system in terms of flows and the size of the region which shall cover at least one capacity calculation region.

1. Visão geral

,
Título Regulamentação

1.1 Referências

1.2 Requisitos identificados

1.3 Normas relacionadas

2. Requisitos identificados

Requisitos
Fonte Requisito

3. Normas relacionadas

Normas
Fonte Requisito