+Article 6 5.

Article 6 5.

The load expressed in p.e. shall be calculated on the basis of the maximum average weekly load entering the urban wastewater treatment plant during the year, excluding unusual weather situations such as those due to heavy rain.

1. Visão geral

,
Título Regulamentação

1.1 Referências

1.2 Requisitos identificados

1.3 Normas relacionadas

2. Requisitos identificados

Requisitos
Fonte Requisito

3. Normas relacionadas

Normas
Fonte Requisito