|
+Article 2 (36) |
Article 2 (36)‘recovery plan’ means a plan developed by a SIPS operator to re-establish the smooth operation of a SIPS; 1. Visão geral
1.1 Referências1.2 Requisitos identificados1.3 Normas relacionadas2. Requisitos identificados
3. Normas relacionadas
|