|
+Article 18 2 |
Article 18 22. A SIPS operator shall maintain a viable recovery and, except for Eurosystem SIPS, orderly wind-down plan as required under Article 10(4). 1. Visão geral
1.1 Referências1.2 Requisitos identificados1.3 Normas relacionadas2. Requisitos identificados
3. Normas relacionadas
|