|
+Article 5 1. |
Article 5 1.All shipments of waste for which notification is required shall be subject to the requirement of the conclusion of a contract between the notifier and the consignee for the recovery or disposal of the notified waste.
1. Prezentare generală
1.1 Referințe1.2 Cerințe identificate1.3 Standarde asociate2. Cerințe identificate
3. Standarde asociate
|