1. The reclamation facility operator shall ensure that, at the point of compliance, reclaimed water intended for agricultural irrigation as specified in Section 1 of Annex I complies with the following:
|
(a)
|
the minimum requirements for water quality laid down in Section 2 of Annex I;
|
|
(b)
|
any additional conditions set by the competent authority in the relevant permit pursuant to points (c) and (d) of Article 6(3), as regards water quality.
|
Beyond the point of compliance, the quality of the water shall no longer be the responsibility of the reclamation facility operator.