|
+Article 10 2. |
Article 10 2.The permit-granting procedure for the installation of solar energy equipment set out in Article 16d of Directive (EU) 2018/2001, and simple-notification procedure for grid connections set out in Article 17 of that Directive shall apply to the installation of solar energy equipment on buildings.
1. Prezentare generală
1.1 Referințe1.2 Cerințe identificate1.3 Standarde asociate2. Cerințe identificate
3. Standarde asociate
|