|
+Article 29 3 |
Article 29 33. Before adopting the annual work programme and the network codes referred to in Article 26(1), (2) and (3), the ENTSO for Gas shall indicate how the observations received during the consultation have been taken into consideration. It shall provide reasons where observations have not been taken into account. 1. Prezentare generală
1.1 Referințe1.2 Cerințe identificate1.3 Standarde asociate2. Cerințe identificate
3. Standarde asociate
|