OPS.1.1.3.A13 Measuring the Success of Change Requests [Process Owner] (H)

The Process Owner for patch and change management SHOULD perform follow-up tests to verify that a given change has been successful. For this, the Process Owner SHOULD select suitable reference systems as quality assurance systems. The results of follow-up tests SHOULD be documented within the scope of the change process.