+SYS.1.6.A1 Planning Container Use (B)

SYS.1.6.A1 Planning Container Use (B)

Before containers are deployed, the goal of such a deployment (e.g. scaling, availability, disposable containers for safety or CI/CD) SHOULD be determined so that all the security-related aspects of installation, operation, and decommissioning can be planned. The planning SHOULD also take into account the operational overhead resulting from container deployment or mixed operation. The planning MUST be adequately documented.

1. Prehľad

Názov Štandard

1.1 Odkazy

1.2 Identifikované požiadavky

1.3 Súvisiace predpisy

2. Identifikované požiadavky

Požiadavky
Zdroj Požiadavka

3. Súvisiace predpisy

Predpisy
Zdroj Regulácia

Prepojené úlohy