+SYS.1.8.A19 Decommissioning Storage Solutions (S)
|
SYS.1.8.A19 Decommissioning Storage Solutions (S)
If entire storage solutions or individual components thereof are no longer required, any data they contain SHOULD be transferred to other storage solutions. A transitional phase SHOULD be scheduled for this. Afterwards, all payload and configuration data SHOULD be securely deleted. Any references to the decommissioned storage solution SHOULD be removed from any relevant documents.
1. Prehľad
1.1 Odkazy
1.2 Identifikované požiadavky
1.3 Súvisiace predpisy
2. Identifikované požiadavky
Požiadavky
| Zdroj |
Požiadavka |
3. Súvisiace predpisy
Prepojené úlohy
|