|
+Article 7 2. |
Article 7 2.The CapEx plan shall specify a deadline, occurring before the European Green Bond reaches maturity, by which all the capital and operating expenditure funded by the European Green Bond are to be taxonomy aligned.
1. Prehľad
1.1 Odkazy1.2 Identifikované požiadavky1.3 Súvisiace štandardy2. Identifikované požiadavky
3. Súvisiace štandardy
|