|
+Article 16 3. |
Article 16 3.The European List shall indicate the date of expiry of the inclusion of the ship recycling facility. An inclusion shall be valid for a maximum period of five years and shall be renewable.
1. Prehľad
1.1 Odkazy1.2 Identifikované požiadavky1.3 Súvisiace štandardy2. Identifikované požiadavky
3. Súvisiace štandardy
|