+Article 63 4

Article 63 4

4.   The minimum mandatory green public procurement requirements may take the form of:

(a)

technical specifications within the meaning of Article 42 of Directive 2014/24/EU and of Article 60 of Directive 2014/25/EU;

(b)

selection criteria within the meaning of Article 58 of Directive 2014/24/EU and of Article 80 of Directive 2014/25/EU; or

(c)

contract performance conditions within the meaning of Article 70 of Directive 2014/24/EU and of Article 87 of Directive 2014/25/EU.

Those minimum mandatory green public procurement requirements shall be developed in accordance with the principles contained in Directives 2014/24/EU and 2014/25/EU to facilitate the achievement of the objectives of this Regulation.

1. Prehľad

,
Názov Regulácia

1.1 Odkazy

1.2 Identifikované požiadavky

1.3 Súvisiace štandardy

2. Identifikované požiadavky

Požiadavky
Zdroj Požiadavka

3. Súvisiace štandardy

Štandardy
Zdroj Požiadavka