+3. Any additional capacity made available through the application of one of the …
|
3. Any additional capacity made available through the application of one of the …
|
3.
|
Any additional capacity made available through the application of one of the congestion-management procedures as provided for in points 2.2.2 to 2.2.5 shall be offered by the relevant transmission system operators in the regular allocation process.
|
1. Prehľad
1.1 Odkazy
1.2 Identifikované požiadavky
1.3 Súvisiace štandardy
2. Identifikované požiadavky
Požiadavky
| Zdroj |
Požiadavka |
3. Súvisiace štandardy
Štandardy
| Zdroj |
Požiadavka |
|