+Člen 14 Merila za izbiro in dodelitev
---+Article 14 1.
---+Article 14 2.

Člen 14 Merila za izbiro in dodelitev

Člen 14

Merila za izbiro in dodelitev

1.  Pri oceni predlogov, prejetih na podlagi razpisa za zbiranje predlogov iz člena 12(1), Komisija uporabi naslednja merila izbire:

(a) utemeljenost in tehnična primernost pristopa;

(b) trdnost finančnega paketa za celotno naložbeno fazo projekta.

2.  Pri oceni predlogov, prejetih na podlagi razpisa za zbiranje predlogov iz člena 12(1), Komisija uporabi naslednja merila dodelitve:

(a) zrelost, kar pomeni, da je projekt v naložbeni fazi, v zvezi z njim pa bodo do konca leta 2010 nastali znatni kapitalski izdatki;

(b) v kolikšnem obsegu nezadosten dostop do virov financiranja zavira izvajanje ukrepov;

(c) v kolikšnem obsegu projekt izboljšuje ali povečuje obseg objektov in naprav ter infrastruktur, ki so že v gradnji ali so v fazi načrtovanja;

(d) v kolikšnem obsegu projekt vključuje gradnjo objektov in naprav ter infrastruktur v polnem industrijskem obsegu in obravnava zlasti:

(i) uravnoteženje variabilnosti elektrike vetrnih elektrarn z dopolnilnimi sistemi;

(ii) obstoj sistemov skladiščenja na veliko;

(iii) upravljanje polj vetrnih elektrarn, ki tvorijo virtualne električne centrale (z močjo več kot 1 GW);

(iv) obstoj turbin, ki so postavljene dalj od obale ali globlje v morju (20 do 50 m), kot je običajni standard;

(v) nove zasnove podpornih delov; ali

(vi) procese za montažo, namestitev, delovanje ter opustitev in preizkušanje teh postopkov na projektih v naravni velikosti;

(e) inovativne značilnosti projekta in v kolikšnem obsegu bo prikazal izvajanje teh značilnosti;

(f) vpliv projekta in njegov prispevek k omrežju Skupnosti vetrnih elektrarn na morju vključno z reprodukcijskim potencialom;

(g) zavezanost upravičencev za razširjanje rezultatov tehnološkega napredka projekta pri drugih evropskih izvajalcih na način, ki je skladen z zakonodajo Skupnosti in zlasti s cilji in strukturami, začrtanimi v Evropskem strateškem načrtu za energetsko tehnologijo.

1. Pregled

,
Naslov Regulativa
Article 14 1.

In assessing the proposals received under the call for proposals referred to in Article 12(1), the Commission shall apply the following selection criteria:

(a) 

the soundness and technical adequacy of the approach;

(b) 

the soundness of the financial package for the full investment phase of the project.

Article 14 2.

In assessing the proposals received under the call for proposals referred to in Article 12(1), the Commission shall apply the following award criteria:

(a) 

maturity, defined as reaching the investment stage, and incurring substantial capital expenditure by the end of 2010;

(b) 

the extent to which lack of access to finance is delaying the implementation of the action;

(c) 

the extent to which the project improves or increases the scale of installations and infrastructures that are already under construction, or are in the planning phase;

(d) 

the extent to which the project includes the construction of full-size and industrial-scale installations and infrastructures, and addresses in particular the following matters:

(i) 

the balancing of the variability of wind electricity through integrative systems;

(ii) 

the existence of large-scale storage systems;

(iii) 

the management of wind farms as virtual power plants (more than 1 GW);

(iv) 

the existence of turbines placed further from the shore or in deeper waters (20 to 50 m) than is currently standard;

(v) 

novel sub-structure designs; or

(vi) 

processes for assembly, installation, operation and decommissioning and testing of these processes in life-size projects;

(e) 

the innovative features of the project and the extent to which it will demonstrate the implementation of such features;

(f) 

the impact of the project and its contribution to the Community’s offshore wind grid system, including its replication potential;

(g) 

the commitment demonstrated by the beneficiaries to disseminate to other European operators the results of technological advances made by the project in a manner compatible with Community law and in particular with the objectives and structures outlined in the Strategic Energy Technology Plan for Europe.

1.1 Sklici

1.2 Ugotovljene zahteve

1.3 Povezani standardi

2. Ugotovljene zahteve

Zahteve
Vir Zahteva

3. Povezani standardi

Standardi
Vir Zahteva
  • Builddate: 24.12.2018 00:00:00 -Doknr: CELEX:32009R0663
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.