+REGULATION (EU) 2019/943 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 June 2019 on the internal market for electricity (recast) (Text with EEA relevance)
---+CHAPTER I SUBJECT MATTER, SCOPE AND DEFINITIONS
------+Article 1 Subject matter and scope
------+Article 2 Definitions
---+CHAPTER II GENERAL RULES FOR THE ELECTRICITY MARKET
------+Article 3 Principles regarding the operation of electricity markets
------+Article 4 Just transition
------+Article 5 Balance responsibility
---------+Article 5 1.
---------+Article 5 2.
---------+Article 5 3.
---------+Article 5 4.
------+Article 6 Balancing market
---------+Article 6 1.
---------+Article 6 2.
---------+Article 6 3.
---------+Article 6 4.
---------+Article 6 5.
---------+Article 6 6.
---------+Article 6 7.
---------+Article 6 8.
---------+Article 6 9.
---------+Article 6 10.
---------+Article 6 11.
---------+Article 6 12.
---------+Article 6 13.
---------+Article 6 14.
------+Article 7 Day-ahead and intraday markets
---------+Article 7 1.
---------+Article 7 2.
------+Article 7a Peak-shaving product
---------+Article 7a 1.
---------+Article 7a 2.
---------+Article 7a 3.
---------+Article 7a 4.
---------+Article 7a 5.
---------+Article 7a 6.
---------+Article 7a 7.
---------+Article 7a 8.
------+Article 7b Dedicated measurement device
---------+Article 7b 1.
---------+Article 7b 2.
---------+Article 7b 3.
------+Article 8 Trade on day-ahead and intraday markets
---------+Article 8 1.
---------+Article 8 1a.
---------+Article 8 1b.
---------+Article 8 1c.
---------+Article 8 2.
---------+Article 8 3.
---------+Article 8 4.
------+Article 9 Forward markets
---------+Article 9 1.
---------+Article 9 2.
---------+Article 9 3.
---------+Article 9 4.
---------+Article 9 5.
---------+Article 9 6.
---------+Article 9 7.
---------+Article 9 8.
---------+Article 9 9.
------+Article 10 Technical bidding limits
---------+Article 10 1.
---------+Article 10 2.
---------+Article 10 3.
---------+Article 10 4.
---------+Article 10 5.
------+Article 11 Value of lost load
---------+Article 11 1.
---------+Article 11 2.
------+Article 12 Dispatching of generation and demand response
---------+Article 12 1.
---------+Article 12 2.
---------+Article 12 3.
---------+Article 12 4.
---------+Article 12 5.
---------+Article 12 6.
---------+Article 12 7.
------+Article 13 Redispatching
---------+Article 13 1.
---------+Article 13 2.
---------+Article 13 3.
---------+Article 13 4.
---------+Article 13 5.
---------+Article 13 6.
---------+Article 13 7.
---+CHAPTER III NETWORK ACCESS AND CONGESTION MANAGEMENT
------+SECTION 1 Capacity Allocation
---------+Article 14 Bidding zone review
------------+Article 14 1.
------------+Article 14 2.
------------+Article 14 3.
------------+Article 14 4.
------------+Article 14 5.
------------+Article 14 6.
------------+Article 14 7.
------------+Article 14 8.
------------+Article 14 9.
------------+Article 14 10.
------------+Article 14 11.
---------+Article 15 Action plans
------------+Article 15 1.
------------+Article 15 2.
------------+Article 15 3.
------------+Article 15 4.
------------+Article 15 5.
------------+Article 15 6.
------------+Article 15 7.
---------+Article 16 General principles of capacity allocation and congestion management
------------+Article 16 1.
------------+Article 16 2.
------------+Article 16 3.
------------+Article 16 4.
------------+Article 16 5.
------------+Article 16 6.
------------+Article 16 7.
------------+Article 16 8.
------------+Article 16 9.
------------+Article 16 10.
------------+Article 16 11.
------------+Article 16 12.
------------+Article 16 13.
---------+Article 17 Allocation of cross-zonal capacity across timeframes
------------+Article 17 1.
------------+Article 17 2.
------------+Article 17 3.
------------+Article 17 4.
------------+Article 17 5.
------+SECTION 2 Network charges and congestion income
---------+Article 18 Charges for access to networks, use of networks and reinforcement
------------+Article 18 1.
------------+Article 18 2.
------------+Article 18 3.
------------+Article 18 4.
------------+Article 18 5.
------------+Article 18 6.
------------+Article 18 7.
------------+Article 18 8.
------------+Article 18 9.
------------+Article 18 10.
---------+Article 19 Congestion income
------------+Article 19 1.
------------+Article 19 2.
------------+Article 19 3.
------------+Article 19 4.
------------+Article 19 5.
---+CHAPTER IIIa SPECIFIC INVESTMENT INCENTIVES TO ACHIEVE THE UNION’S DECARBONISATION OBJECTIVES
------+Article 19a Power purchase agreements
---------+Article 19a 1.
---------+Article 19a 2.
---------+Article 19a 3.
---------+Article 19a 4.
---------+Article 19a 5.
---------+Article 19a 6.
---------+Article 19a 7.
---------+Article 19a 8.
---------+Article 19a 9.
---------+Article 19a 10.
------+Article 19b Voluntary templates for PPAs and monitoring of PPAs
---------+Article 19b 1.
---------+Article 19b 2.
------+Article 19c Measures at Union level to contribute to the achievement of the additional share of energy from renewable sources
------+Article 19d Direct price support schemes in the form of two-way contracts for difference for investment
---------+Article 19d 1.
---------+Article 19d 2.
---------+Article 19d 3.
---------+Article 19d 4.
---------+Article 19d 5.
---------+Article 19d 6.
------+Article 19e Assessment of flexibility needs
---------+Article 19e 1.
---------+Article 19e 2.
---------+Article 19e 3.
---------+Article 19e 4.
---------+Article 19e 5.
---------+Article 19e 6.
---------+Article 19e 7.
---------+Article 19e 8.
------+Article 19f Indicative national objective for non-fossil flexibility
------+Article 19g Non-fossil flexibility support schemes
---------+Article 19g 1.
---------+Article 19g 2.
------+Article 19h Design principles for non-fossil flexibility support schemes
---+CHAPTER IV RESOURCE ADEQUACY
------+Article 20 Resource adequacy in the internal market for electricity
---------+Article 20 1.
---------+Article 20 2.
---------+Article 20 3.
---------+Article 20 4.
---------+Article 20 5.
---------+Article 20 6.
---------+Article 20 7.
---------+Article 20 8.
------+Article 21 General principles for capacity mechanisms
---------+Article 21 1.
---------+Article 21 2.
---------+Article 21 3.
---------+Article 21 4.
---------+Article 21 5.
---------+Article 21 6.
---------+Article 21 8.
------+Article 22 Design principles for capacity mechanisms
---------+Article 22 1.
---------+Article 22 2.
---------+Article 22 3.
---------+Article 22 4.
---------+Article 22 5.
------+Article 23 European resource adequacy assessment
---------+Article 23 1.
---------+Article 23 2.
---------+Article 23 3.
---------+Article 23 4.
---------+Article 23 5.
---------+Article 23 6.
---------+Article 23 7.
------+Article 24 National resource adequacy assessments
---------+Article 24 1.
---------+Article 24 2.
---------+Article 24 3.
------+Article 25 Reliability standard
---------+Article 25 1.
---------+Article 25 2.
---------+Article 25 3.
---------+Article 25 4.
------+Article 26 Cross-border participation in capacity mechanisms
---------+Article 26 1.
---------+Article 26 2.
---------+Article 26 3.
---------+Article 26 4.
---------+Article 26 5.
---------+Article 26 6.
---------+Article 26 7.
---------+Article 26 8.
---------+Article 26 9.
---------+Article 26 10.
---------+Article 26 11.
---------+Article 26 12.
---------+Article 26 13.
---------+Article 26 14.
---------+Article 26 15.
------+Article 27 Approval procedure
---------+Article 27 1.
---------+Article 27 2.
---------+Article 27 3.
---------+Article 27 4.
---+CHAPTER V TRANSMISSION SYSTEM OPERATION
------+Article 28 European network of transmission system operators for electricity
---------+Article 28 1.
---------+Article 28 2.
------+Article 29 The ENTSO for Electricity
---------+Article 29 1.
---------+Article 29 2.
---------+Article 29 3.
---------+Article 29 4.
---------+Article 29 5.
------+Article 30 Tasks of the ENTSO for Electricity
---------+Article 30 1.
---------+Article 30 2.
---------+Article 30 3.
---------+Article 30 4.
---------+Article 30 5.
---------+Article 30 6.
------+Article 31 Consultations
---------+Article 31 1.
---------+Article 31 2.
---------+Article 31 3.
------+Article 32 Monitoring by ACER
---------+Article 32 1.
---------+Article 32 2.
------+Article 33 Costs
------+Article 34 Regional cooperation of transmission system operators
---------+Article 34 1.
---------+Article 34 2.
---------+Article 34 3.
------+Article 35 Establishment and mission of regional coordination centres
---------+Article 35 1.
---------+Article 35 2.
---------+Article 35 3.
---------+Article 35 4.
---------+Article 35 5.
------+Article 36 Geographical scope of regional coordination centres
---------+Article 36 1.
---------+Article 36 2.
---------+Article 36 3.
---------+Article 36 4.
------+Article 37 Tasks of regional coordination centres
---------+Article 37 1.
---------+Article 37 2.
---------+Article 37 3.
---------+Article 37 4.
---------+Article 37 5.
------+Article 38 Cooperation within and between regional coordination centres
------+Article 39 Working arrangements
---------+Article 39 1.
---------+Article 39 2.
------+Article 40 Consultation procedure
---------+Article 40 1.
---------+Article 40 2.
------+Article 41 Transparency
---------+Article 41 1.
---------+Article 41 2.
------+Article 42 Adoption and review of coordinated actions and recommendations
---------+Article 42 1.
---------+Article 42 2.
---------+Article 42 3.
---------+Article 42 4.
---------+Article 42 5.
---------+Article 42 6.
------+Article 43 Management board of regional coordination centres
---------+Article 43 1.
---------+Article 43 2.
---------+Article 43 3.
---------+Article 43 4.
------+Article 44 Organisational structure
---------+Article 44 1.
---------+Article 44 2.
------+Article 45 Equipment and staff
------+Article 46 Monitoring and reporting
---------+Article 46 1.
---------+Article 46 2.
---------+Article 46 3.
---------+Article 46 4.
---------+Article 46 5.
------+Article 47 Liability
------+Article 48 Ten-year network development plan
---------+Article 48 1.
---------+Article 48 2.
------+Article 49 Inter-transmission system operator compensation mechanism
---------+Article 49 1.
---------+Article 49 2.
---------+Article 49 3.
---------+Article 49 4.
---------+Article 49 5.
---------+Article 49 6.
---------+Article 49 7.
------+Article 50 Provision of information
---------+Article 50 1.
---------+Article 50 2.
---------+Article 50 3.
---------+Article 50 4.
---------+Article 50 4a.
---------+Article 50 5.
---------+Article 50 6.
---------+Article 50 7.
------+Article 51 Certification of transmission system operators
---------+Article 51 1.
---------+Article 51 2.
---------+Article 51 3.
---------+Article 51 4.
---------+Article 51 5.
---+CHAPTER VI DISTRIBUTION SYSTEM OPERATION
------+Article 52 European entity for distribution system operators
---------+Article 52 1.
---------+Article 52 2.
---------+Article 52 3.
------+Article 53 Establishment of the EU DSO entity
---------+Article 53 1.
---------+Article 53 2.
---------+Article 53 3.
---------+Article 53 4.
---------+Article 53 5.
---------+Article 53 6.
---------+Article 53 7.
------+Article 54 Principal rules and procedures for the EU DSO entity
---------+Article 54 1.
---------+Article 54 2.
------+Article 55 Tasks of the EU DSO entity
---------+Article 55 1.
---------+Article 55 2.
------+Article 56 Consultations in the network code development process
---------+Article 56 1.
---------+Article 56 2.
---------+Article 56 3.
------+Article 57 Cooperation between distribution system operators and transmission system operators
---------+Article 57 1.
---------+Article 57 2.
---------+Article 57 3.
---+CHAPTER VII NETWORK CODES AND GUIDELINES
------+Article 58 Adoption of network codes and guidelines
---------+Article 58 1.
---------+Article 58 2.
------+Article 59 Establishment of network codes
---------+Article 59 1.
---------+Article 59 2.
---------+Article 59 3.
---------+Article 59 4.
---------+Article 59 5.
---------+Article 59 6.
---------+Article 59 7.
---------+Article 59 8.
---------+Article 59 9.
---------+Article 59 10.
---------+Article 59 11.
---------+Article 59 12.
---------+Article 59 13.
---------+Article 59 14.
---------+Article 59 15.
------+Article 60 Amendments of network codes
---------+Article 60 1.
---------+Article 60 2.
---------+Article 60 3.
------+Article 61 Guidelines
---------+Article 61 1.
---------+Article 61 2.
---------+Article 61 3.
---------+Article 61 4.
---------+Article 61 5.
---------+Article 61 6.
------+Article 62 Right of Member States to provide for more detailed measures
---+CHAPTER VIII FINAL PROVISIONS
------+Article 63 New interconnectors
---------+Article 63 1.
---------+Article 63 2.
---------+Article 63 3.
---------+Article 63 4.
---------+Article 63 5.
---------+Article 63 6.
---------+Article 63 7.
---------+Article 63 8.
---------+Article 63 9.
---------+Article 63 10.
---------+Article 63 11.
------+Article 64 Derogations
---------+Article 64 1.
---------+Article 64 2.
---------+Article 64 2a.
---------+Article 64 2b.
---------+Article 64 2c.
---------+Article 64 2d.
---------+Article 64 3.
---------+Article 64 4.
------+Article 65 Provision of information and confidentiality
---------+Article 65 1.
---------+Article 65 2.
---------+Article 65 3.
---------+Article 65 4.
---------+Article 65 5.
---------+Article 65 6.
------+Article 66 Penalties
---------+Article 66 1.
---------+Article 66 2.
---------+Article 66 3.
------+Article 67 Committee procedure
---------+Article 67 1.
---------+Article 67 2.
------+Article 68 Exercise of the delegation
---------+Article 68 1.
---------+Article 68 2.
---------+Article 68 3.
---------+Article 68 4.
---------+Article 68 5.
---------+Article 68 6.
------+Article 69 Commission reviews and reports
---------+Article 69 1.
---------+Article 69 2.
---------+Article 69 3.
------+Article 69a Interaction with Union financial legal acts
------+Article 70 Repeal
------+Article 71 Entry into force
---------+Article 71 1.
---------+Article 71 2.
---+ANNEX I
---+ANNEX II
---+ANNEX III
English - European Union - Energy -

REGULATION (EU) 2019/943 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 June 2019 on the internal market for electricity (recast) (Text with EEA relevance)

REGULATION (EU) 2019/943 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

of 5 June 2019

on the internal market for electricity

(recast)

(Text with EEA relevance)

This Regulation shall be binding in its entirety and directly applicable in all Member States.

1. Pregled

,
Naslov Regulativa
CHAPTER I SUBJECT MATTER, SCOPE AND DEFINITIONS CHAPTER I SUBJECT MATTER, SCOPE AND DEFINITIONS
CHAPTER II GENERAL RULES FOR THE ELECTRICITY MARKET CHAPTER II GENERAL RULES FOR THE ELECTRICITY MARKET
CHAPTER III NETWORK ACCESS AND CONGESTION MANAGEMENT CHAPTER III NETWORK ACCESS AND CONGESTION MANAGEMENT
CHAPTER IIIa SPECIFIC INVESTMENT INCENTIVES TO ACHIEVE THE UNION’S DECARBONISATION OBJECTIVES CHAPTER IIIa SPECIFIC INVESTMENT INCENTIVES TO ACHIEVE THE UNION’S DECARBONISATION OBJECTIVES
CHAPTER IV RESOURCE ADEQUACY CHAPTER IV RESOURCE ADEQUACY
CHAPTER V TRANSMISSION SYSTEM OPERATION CHAPTER V TRANSMISSION SYSTEM OPERATION
CHAPTER VI DISTRIBUTION SYSTEM OPERATION CHAPTER VI DISTRIBUTION SYSTEM OPERATION
CHAPTER VII NETWORK CODES AND GUIDELINES CHAPTER VII NETWORK CODES AND GUIDELINES
CHAPTER VIII FINAL PROVISIONS CHAPTER VIII FINAL PROVISIONS
ANNEX I




ANNEX I

TASKS OF REGIONAL COORDINATION CENTRES

1.   Coordinated capacity calculation

1.1 Regional coordination centres shall carry out the coordinated calculation of cross-zonal capacities.

▼M2

1.2. Coordinated capacity calculation shall be performed for all allocation timeframes.

▼B

1.3 Coordinated capacity calculation shall be performed on the basis of the methodologies developed pursuant to the guideline on capacity allocation and congestion management adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009.

1.4 Coordinated capacity calculation shall be performed based on a common grid model in accordance with point 3.

1.5 Coordinated capacity calculation shall ensure an efficient congestion management in accordance with the principles of congestion management defined in this Regulation.

2.   Coordinated security analysis

2.1 Regional coordination centres shall carry out a coordinated security analysis aiming to ensure secure system operation.

2.2 Security analysis shall be performed for all operational planning timeframes, between the year-ahead and intraday timeframes, using the common grid models.

2.3 Coordinated security analysis shall be performed on the basis of the methodologies developed pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009.

2.4 Regional coordination centres shall share the results of the coordinated security analysis with at least the transmission system operators in the system operation region.

2.5 When as a result of the coordinated security analysis a regional coordination centre detects a possible constraint, it shall design remedial actions maximising effectiveness and economic efficiency.

3.   Creation of common grid models

3.1 Regional coordination centres shall set up efficient processes for the creation of a common grid model for each operational planning timeframe between the year-ahead and intraday timeframes.

3.2 Transmission system operators shall appoint one regional coordination centre to build the Union-wide common grid models.

3.3 Common grid models shall be performed in accordance with the methodologies developed pursuant to the system operation guideline and the capacity allocation and congestion management guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009.

3.4 Common grid models shall include relevant data for efficient operational planning and capacity calculation in all operational planning timeframes between the year-ahead and intraday timeframes.

3.5 Common grid models shall be made available to all regional coordination centres, transmission system operators, ENTSO for Electricity and, upon request, to ACER.

4.   Support for transmission system operators' defence and restoration plans with regard to the consistency assessment

4.1 Regional coordination centres shall support the transmission system operators in the system operation region in carrying out the consistency assessment of transmission system operators' defence plans and restoration plans pursuant to the procedures set out in the network code on electricity emergency and restoration adopted on the basis of Article 6(11) of Regulation (EC) No 714/2009.

4.2 All transmission system operators shall agree on a threshold above which the impact of actions of one or more transmission system operators in the emergency, blackout or restoration states is considered significant for other transmission system operators synchronously or non-synchronously interconnected.

4.3 In providing support to the transmission system operators, the regional coordination centre shall:

(a) 

identify potential incompatibilities;

(b) 

propose mitigation actions.

4.4 Transmission system operators shall assess and take into account the proposed mitigation actions.

5.   Support the coordination and optimisation of regional restoration

5.1 Each relevant regional coordination centre shall support the transmission system operators appointed as frequency leaders and the resynchronisation leaders pursuant to the network code on emergency and restoration adopted on the basis of Article 6(11) of Regulation (EC) No 714/2009 to improve the efficiency and effectiveness of system restoration. The transmission system operators in the system operation region shall establish the role of the regional coordination centre relating to the support to the coordination and optimisation of regional restoration.

5.2 Transmission system operators may request assistance from regional coordination centres if their system is in a blackout or restoration state.

5.3 Regional coordination centres shall be equipped with the close to real time supervisory control and data acquisition systems with the observability defined by applying the threshold referred to in point 4.2.

6.   Post-operation and post-disturbances analysis and reporting

6.1 Regional coordination centres shall investigate and prepare a report on any incident above the threshold referred to in point 4.2. The regulatory authorities in the system operation region and ACER may be involved in the investigation upon their request. The report shall contain recommendations aiming to prevent similar incidents in future.

6.2 Regional coordination centres shall publish the report. ACER may issue recommendations aiming to prevent similar incidents in future.

7.   Regional sizing of reserve capacity

7.1 Regional coordination centres shall calculate the reserve capacity requirements for the system operation region. The determination of reserve capacity requirements shall:

(a) 

pursue the general objective to maintain operational security in the most cost effective manner;

(b) 

be performed at the day-ahead or intraday timeframe, or both;

(c) 

calculate the overall amount of required reserve capacity for the system operation region;

(d) 

determine minimum reserve capacity requirements for each type of reserve capacity;

(e) 

take into account possible substitutions between different types of reserve capacity with the aim to minimise the costs of procurement;

(f) 

set out the necessary requirements for the geographical distribution of required reserve capacity, if any.

8.   Facilitation of the regional procurement of balancing capacity

8.1 Regional coordination centres shall support the transmission system operators in the system operation region in determining the amount of balancing capacity that needs to be procured. The determination of the amount of balancing capacity shall:

(a) 

be performed at the day-ahead or intraday timeframe, or both;

(b) 

take into account possible substitutions between different types of reserve capacity with the aim to minimise the costs of procurement;

(c) 

take into account the volumes of required reserve capacity that are expected to be provided by balancing energy bids, which are not submitted based on a contract for balancing capacity.

8.2 Regional coordination centres shall support the transmission system operators of the system operation region in procuring the required amount of balancing capacity determined in accordance with point 8.1. The procurement of balancing capacity shall:

(a) 

be performed at the day-ahead or intraday timeframe, or both;

(b) 

take into account possible substitutions between different types of reserve capacity with the aim to minimise the costs of procurement.

9.   Week-ahead to at least day-ahead regional system adequacy assessments and preparation of risk reducing actions

9.1 Regional coordination centres shall carry out week-ahead to at least day-ahead regional adequacy assessments in accordance with the procedures set out in Regulation (EU) 2017/1485 and on the basis of the methodology developed pursuant Article 8 of Regulation (EU) 2019/941.

9.2 Regional coordination centres shall base the short-term regional adequacy assessments on the information provided by the transmission system operators of system operation region with the aim of detecting situations where a lack of adequacy is expected in any of the control areas or at regional level. Regional coordination centres shall take into account possible cross-zonal exchanges and operational security limits in all relevant operational planning timeframes.

9.3 When performing a regional system adequacy assessment, each regional coordination centre shall coordinate with other regional coordination centres to:

(a) 

verify the underlying assumptions and forecasts;

(b) 

detect possible cross-regional lack of adequacy situations.

9.4 Each regional coordination centre shall deliver the results of the regional system adequacy assessments together with the actions it proposes to reduce risks of lack of adequacy to the transmission system operators in the system operation region and to other regional coordination centres.

10.   Regional outage planning coordination

10.1 Each Regional coordination centre shall carry out regional outage coordination in accordance with the procedures set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009 in order to monitor the availability status of the relevant assets and coordinate their availability plans to ensure the operational security of the transmission system, while maximising the capacity of the interconnectors and the transmission systems affecting cross-zonal flows.

10.2 Each Regional coordination centre shall maintain a single list of relevant grid elements, power generating modules and demand facilities of the system operation region and make it available on the ENTSO for Electricity operational planning data environment.

10.3 Each Regional coordination centre shall carry out the following activities related to outage coordination in the system operation region:

(a) 

assess outage planning compatibility using all transmission system operators' year-ahead availability plans;

(b) 

provide the transmission system operators in the system operation region with a list of detected planning incompatibilities and the solutions it proposes to solve the incompatibilities.

11.   Optimisation of inter-transmission system operator compensation mechanisms

11.1 The transmission system operators in the system operation region may jointly decide to receive support from the regional coordination centre in administering the financial flows related to settlements between transmission system operators involving more than two transmission system operators, such as redispatching costs, congestion income, unintentional deviations or reserve procurement costs.

12.   Training and certification of staff working for regional coordination centres

12.1 Regional coordination centres shall prepare and carry out training and certification programmes focusing on regional system operation for the personnel working for regional coordination centres.

12.2 The training programs shall cover all the relevant components of system operation, where the regional coordination centre performs tasks including scenarios of regional crisis.

13.   Identification of regional electricity crisis scenarios

13.1 If the ENTSO for Electricity delegates this function, regional coordination centres shall identify regional electricity crisis scenarios in accordance with the criteria set out in Article 6(1) of Regulation (EU) 2019/941.

The identification of regional electricity crisis scenarios shall be performed in accordance with the methodology set out in Article 5 of Regulation (EU) 2019/941.

13.2 Regional coordination centres shall support the competent authorities of each system operation region upon their request in the preparation and carrying out of biennial crisis simulation in accordance with Article 12(3) of Regulation (EU) 2019/941.

14.   Identification of needs for new transmission capacity, for upgrade of existing transmission capacity or their alternatives

14.1 Regional coordination centres shall support transmission system operators in the identification of needs for new transmission capacity, for an upgrade of existing transmission capacity or for their alternatives, to be submitted to the regional groups established pursuant to Regulation (EU) No 347/2013 and to be included in the ten-year network development plan referred to in Article 51 of Directive (EU) 2019/944.

15.   Calculation of the maximum entry capacity available for the participation of foreign capacity in capacity mechanisms

15.1 Regional coordination centres shall support transmission system operator in calculating the maximum entry capacity available for the participation of foreign capacity in capacity mechanisms taking into account the expected availability of interconnection and the likely concurrence of system stress between the system where the mechanism is applied and the system in which the foreign capacity is located.

15.2 The calculation shall be performed in accordance with the methodology set out in point (a) of Article 26(11).

15.3 Regional coordination centres shall provide a calculation for each bidding zone border covered by the system operation region.

16.   Preparation of seasonal adequacy assessments

16.1 If the ENTSO for Electricity delegates this function pursuant to Article 9 of Regulation (EU) 2019/941, regional coordination centres shall carry out regional seasonal adequacy assessments.

16.2 The preparation of seasonal adequacy assessments shall be carried out on the basis of the methodology developed pursuant to Article 8 of Regulation (EU) 2019/941.

ANNEX II




ANNEX II

REPEALED REGULATION WITH LIST OF THE SUCCESSIVE AMENDMENTS THERETO



Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 (OJ L 115, 25.4.2013, p. 39)

Point (a) of Article 8(3)

Point (a) of Article 8(10)

Article 11

Article 18(4a)

Article 23(3)

Commission Regulation (EU) No 543/2013 of 14 June 2013 on submission and publication of data in electricity markets and amending Annex I to Regulation (EC) No 714/2009 of the European Parliament and of the Council (OJ L 163, 15.6.2013, p. 1)

Points 5.5 to 5.9 of Annex I

ANNEX III




ANNEX III

CORRELATION TABLE



Regulation (EC) No 714/2009

This Regulation

—

Article 1(a)

—

Article 1(b)

Article 1(a)

Article 1(c)

Article 1(b)

Article 1(d)

Article 2(1)

Article 2(1)

Article 2(2)(a)

Article 2(2)

Article 2(2)(b)

Article 2(3)

Article 2(2)(c)

Article 2(4)

Article 2(2)(d)

—

Article 2(2)(e)

—

Article 2(2)(f)

—

Article 2(2)(g)

Article 2 (5)

—

Article 2 (6) to (71)

—

Article 3

—

Article 4

—

Article 5

—

Article 6

—

Article 7

—

Article 8

—

Article 9

—

Article 10

—

Article 11

—

Article 12

—

Article 13

—

Article 14

—

Article 15

Article 16(1) to (3)

Article 16(1) to (4)

—

Article 16(5) to (8)

Article 16(4) to (5)

Article 16(9) to (11)

—

Article 16(12) and (13)

—

Article 17

Article 14(1)

Article 18(1)

—

Article 18(2)

Article 14(2) to (5)

Article 18(3) to (6)

—

Article 18(7) to (11)

—

Article 19(1)

Article 16(6)

Article 19(2) and (3)

—

Article 19(4) and (5)

—

Article 20

—

Article 21

—

Article 22

Article 8(4)

Article 23(1)

—

Article 23(2) to (7)

—

Article 25

—

Article 26

—

Article 27

Article 4

Article 28(1)

—

Article 28(2)

Article 5

Article 29 (1) to (4)

—

Article 29(5)

Article 8(2) (first sentence)

Article 30(1)(a)

Article 8(3)(b)

Article 30(1)(b)

—

Article 30(1)(c)

Article 8(3)(c)

Article 30 (1)(d)

—

Article 30 (1)(e) and (f)

 

Article 30(1) (g) and (h)

Article 8 (3)(a)

Article 30(1)(i)

Article 8(3)(d)

Article 30(1)(j)

 

Article 30(1)(k)

Article 8(3)(e)

Article 30(1)(l)

 

Article 30(1)(m) to (o)

—

Article 30(2) and (3)

Article 8(5)

Article 30(4)

Article 8(9)

Article 30(5)

Article 10

Article 31

Article 9

Article 32

Article 11

Article 33

Article 12

Article 34

—

Article 35

—

Article 36

—

Article 37

—

Article 38

—

Article 39

—

Article 40

 

Article 41

—

Article 42

—

Article 43

—

Article 44

—

Article 45

—

Article 46

—

Article 47

Article 8(10)

Article 48

Article 13

Article 49

Article 2(2) (final subparagraph)

Article 49(7)

Article 15

Article 50(1) to (6)

Annex I point 5.10

Article 50(7)

Article 3

Article 51

—

Article 52

—

Article 53

 

Article 54

—

Article 55

—

Article 56

—

Article 57

—

Article 58

Article 8(6)

Article 59(1)(a), (b) and (c)

—

Article 59(1)(d) and (e)

 

Article 59(2)

Article 6(1)

Article 59(3)

Article 6(2)

Article 59(4)

Article 6(3)

Article 59(5)

—

Article 59(6)

Article 6(4)

Article 59(7)

Article 6(5)

Article 59(8)

Article 6(6)

Article 59(9)

Article 8(1)

Article 59(10)

Article 6(7)

—

Article 6(8)

—

Article 6(9) and (10)

Article 59(11) and (12)

Article 6(11)

Article 59(13) and (14)

Article 6 (12)

Article 59(15)

Article 8(2)

Article 59(15)

—

Article 60(1)

Article 7(1)

Article 60(2)

Article 7(2)

Article 60(3)

Article 7(3)

—

Article 7(4)

—

—

Article 61(1)

—

Article 61(2)

Article 18(1)

Article 61(3)

Article 18(2)

—

Article 18(3)

Article 61(4)

Article 18(4)

—

Article 18(4a)

Article 61(5)

Article 18(5)

Article 61(5) and (6)

Article 19

—

Article 21

Article 62

Article 17

Article 63

—

Article 64

Article 20

Article 65

Article 22

Article 66

Article 23

Article 67

Article 24

—

—

Article 68

—

Article 69

Article 25

Article 70

Article 26

Article 71

1.1 Sklici

1.2 Ugotovljene zahteve

1.3 Povezani standardi

2. Ugotovljene zahteve

Zahteve
Vir Zahteva

3. Povezani standardi

Standardi
Vir Zahteva

Povezane zadeve