+Article 14 2.

Article 14 2.

With regard to all non-residential buildings with more than 20 car parking spaces, Member States shall, by 1 January 2027, ensure:

(a) 

the installation of at least one recharging point for every 10 car parking spaces, or of ducting, namely conduits for electric cables, for at least 50 % of the car parking spaces to enable the installation at a later stage of recharging points for electric vehicles; and

(b) 

the provision of bicycle parking spaces representing at least 15 % of average or 10 % of total user capacity of the building and with space required also for bicycles with larger dimensions than standard bicycles.

For buildings owned or occupied by public bodies, Member States shall ensure the installation of pre-cabling for at least 50 % of car parking spaces by 1 January 2033.

Member States may postpone the implementation of this requirement until 1 January 2029 for all non-residential buildings that have been renovated in the two years prior to 28 May 2024 in order to comply with the national requirements established in accordance with Article 8(3) of Directive 2010/31/EU.