+Article 18 6.
|
Article 18 6.
After the transfer of responsibility, routine inspections provided for in Article 15(3) shall cease and monitoring may be reduced to a level which allows for detection of leakages or significant irregularities. If any leakages or significant irregularities are detected, monitoring shall be intensified as required to assess the scale of the problem and the effectiveness of corrective measures.
1. Översikt
1.1 Referenser
1.2 Identifierade krav
1.3 Relaterade standarder
2. Identifierade krav
3. Relaterade standarder
|