|
+Article 6 7. |
Article 6 7.The dimensioning of reserve capacity shall be performed by the transmission system operators and shall be facilitated at regional level.
1. Översikt
1.1 Referenser1.2 Identifierade krav1.3 Relaterade standarder2. Identifierade krav
3. Relaterade standarder
|