+Article 49 1.

Article 49 1.

Transmission system operators shall receive compensation for costs incurred as a result of hosting cross-border flows of electricity on their networks.

1. Översikt

,
Rubrik Reglering

1.1 Referenser

1.2 Identifierade krav

1.3 Relaterade standarder

2. Identifierade krav

Krav
Källa Krav

3. Relaterade standarder

Standarder
Källa Krav