|
+Article 2 (37) |
Article 2 (37)‘orderly wind-down plan’ means a plan developed by a SIPS operator for the orderly closure of a SIPS; 1. Översikt
1.1 Referenser1.2 Identifierade krav1.3 Relaterade standarder2. Identifierade krav
3. Relaterade standarder
|