+3. Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the …

3. Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the …

3.

Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the network user at the interconnection point. However, if the nomination exceeds 80 % of the contracted capacity, half of the non-nominated volume may be renominated upwards. If the nomination does not exceed 20 % of the contracted capacity, half of the nominated volume may be renominated downwards. The application of this point is without prejudice to the applicable emergency measures.

1. Přehled

,
Název Regulace

1.1 Odkazy

1.2 Identifikované požadavky

1.3 Související standardy

2. Identifikované požadavky

Požadavky
Zdroj Požadavek

3. Související standardy

Standardy
Zdroj Požadavek