+3. Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the …
|
3. Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the …
|
3.
|
Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the network user at the interconnection point. However, if the nomination exceeds 80 % of the contracted capacity, half of the non-nominated volume may be renominated upwards. If the nomination does not exceed 20 % of the contracted capacity, half of the nominated volume may be renominated downwards. The application of this point is without prejudice to the applicable emergency measures.
|
1. Visão geral
1.1 Referências
1.2 Requisitos identificados
1.3 Normas relacionadas
2. Requisitos identificados
Requisitos
| Fonte |
Requisito |
3. Normas relacionadas
|