+3. The oversubscription and buy-back scheme shall be based on an incentive regime reflecting the …

3. The oversubscription and buy-back scheme shall be based on an incentive regime reflecting the …

3.

The oversubscription and buy-back scheme shall be based on an incentive regime reflecting the risks of transmission system operators in offering additional capacity. That scheme shall be structured in such a way that revenue from selling additional capacity and costs arising from the buy-back scheme or measures pursuant to point 6 are shared between the transmission system operators and the network users. Regulatory authorities shall decide on the distribution of revenue and costs between the transmission system operator and the network user.

1. Oversigt

,
Titel Regulering

1.1 Referencer

1.2 Identificerede krav

1.3 Relaterede standarder

2. Identificerede krav

Krav
Kilde Krav

3. Relaterede standarder

Standarder
Kilde Krav
  • Builddate: 15.07.2024 00:00:00 -Doknr: CELEX:32024R1789
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.