+Article 25 4

Article 25 4

4.   The verification referred to in paragraph 3 shall take place electronically and automatically via the interconnection between the registry and the EU Customs Single Window Certificates Exchange System and shall apply from 23 September 2029 or from the date that interconnection is operational, whichever is later.

1. Oversigt

,
Titel Regulering

1.1 Referencer

1.2 Identificerede krav

1.3 Relaterede standarder

2. Identificerede krav

Krav
Kilde Krav

3. Relaterede standarder

Standarder
Kilde Krav