+Article 423 2.
|
Article 423 2.
An institution shall notify the competent authorities of all contracts entered into of which the contractual conditions lead to liquidity outflows or additional collateral needs, within 30 days after a material deterioration of the institution's credit quality. Where the competent authorities consider those contracts to be material in relation to the potential liquidity outflows of the institution, they shall require the institution to add an additional outflow for those contracts, which shall correspond to the additional collateral needs resulting from a material deterioration in its credit quality, such as a downgrade in its external credit assessment by three notches. The institution shall regularly review the extent of that material deterioration in light of what is relevant under the contracts it has entered into, and shall notify the result of its review to the competent authorities.
1. Übersicht
| Bezeichnung |
Regulierung |
,
1.1 Referenzen
1.2 Identifizierte Anforderungen
1.3 Zugehörige Standards
2. Identifizierte Anforderungen
Anforderungen
| Quelle |
Anforderung |
3. Zugehörige Standards
Standards
| Quelle |
Anforderung |
|