+ANNEX I Leak detection and repair surveys as referred to in Article 14
---+1. For all aboveground and underground components, excluding distribution and transmission networks …
---+2. For all components of distribution and transmission networks, LDAR surveys shall be carried out …
---+3. For all offshore components, LDAR surveys shall be carried out at the following minimum …
---+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
---+1. manufacturer information about the device;
---+2. information about the leak detection capabilities, reliability and limitations of the device …
---+3. a description of where, when and how the device will be used.
|
ANNEX I Leak detection and repair surveys as referred to in Article 14
ANNEX I Leak detection and repair surveys as referred to in Article 14
1. Επισκόπηση
| Τίτλος |
Κανονισμός |
|
1. For all aboveground and underground components, excluding distribution and transmission networks …
|
|
1.
|
For all aboveground and underground components, excluding distribution and transmission networks LDAR surveys shall be carried out at the following minimum frequency:
|
Type of LDAR survey
|
Type of component
|
Frequency
|
|
Type 1 LDAR survey
|
Compressor station
Underground storage
LNG facility
Regulating and metering station
|
4 months
|
|
|
Valve station
|
9 months
|
|
Type 2 LDAR survey
|
Compressor station
Underground storage
LNG facility
Regulating and metering station
|
8 months
|
|
|
Valve station
|
18 months
|
|
Type of LDAR survey
|
Type of material
|
Frequency
|
|
Type 1 LDAR survey
|
Bitumen sheet
Grey cast iron
|
3 months
|
|
|
Asbestos
Ductile cast iron
|
6 months
|
|
|
Non-protected steel
Copper
|
9 months
|
|
|
Polyethylene
PVC
Protected steel
|
15 months
|
|
Type 2 LDAR survey
|
Bitumen sheet
Grey cast iron
|
6 months
|
|
|
Asbestos
Ductile cast iron
|
12 months
|
|
|
Non-protected steel
Polyethylene
PVC
Copper
|
18 months
|
|
|
Protected steel
|
30 months
|
Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.
|
|
|
2. For all components of distribution and transmission networks, LDAR surveys shall be carried out …
|
|
2.
|
For all components of distribution and transmission networks, LDAR surveys shall be carried out at the following minimum frequency:
|
Type of LDAR survey
|
Type of component
|
Frequency
|
|
Type 1 LDAR survey
(design pressure > 16 bar)
|
Compressor station
Regulating and metering station
|
4 months
|
|
|
Valve station
|
9 months
|
|
Type 2 LDAR survey
(design pressure > 16 bar)
|
Compressor station
Regulating and metering station
|
8 months
|
|
|
Valve station
|
18 months
|
|
Type 2 LDAR survey
(design pressure ≤ 16 bar)
|
Regulating and metering station
|
9 months
|
|
|
Valve station
|
21 months
|
|
Type of LDAR survey
|
Type of material
|
Frequency of survey
|
|
Type 1 LDAR survey
(design pressure > 16 bar)
|
Grey cast iron
Bitumen sheet
|
3 months
|
|
|
Asbestos
Ductile cast iron
|
6 months
|
|
|
Non-protected steel
Copper
|
12 months
|
|
|
Polyethylene
PVC
Protected steel
|
24 months
|
|
Type 2 LDAR survey
(design pressure > 16 bar)
|
Grey cast iron
Bitumen sheet
|
6 months
|
|
|
Asbestos
Ductile cast iron
|
12 months
|
|
|
Non-protected steel
Copper
|
24 months
|
|
|
Polyethylene
PVC
Protected steel
|
36 months
|
|
Type 2 LDAR survey
(design pressure ≤ 16 bar)
|
Grey cast iron
Bitumen sheet
|
6 months
|
|
|
Asbestos
Ductile cast iron
|
12 months
|
|
|
Non-protected steel
Copper
|
24 months
|
|
|
Polyethylene
PVC
Protected steel
|
36 months
|
Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.
LDAR surveys may be carried out using a two-step approach: first from a distance and, only where a leak is detected, via a second detection as close as possible to the source.
For underground and below-the-sea-level protected steel pipelines with design pressure above 16 bar, operators shall also perform risk-based preventive pipeline integrity management to prevent any leakage in accordance with relevant European standards or national pipeline integrity management legislation. Preventive pipeline integrity management shall include constant monitoring of flow, fluid composition, pressure and temperature of the gas transported in the system to ensure that those parameters correspond to the applicable pipeline integrity specifications, as well as to locate the source of potential methane emissions and to estimate them. Taking into account the results of that preventive pipeline integrity management, the competent authority may approve a different frequency of up to 36 months for a type 1 LDAR survey and up to 48 months for a type 2 LDAR survey.
|
|
|
3. For all offshore components, LDAR surveys shall be carried out at the following minimum …
|
|
3.
|
For all offshore components, LDAR surveys shall be carried out at the following minimum frequency:
|
Type of LDAR survey
|
Type of component
|
Frequency
|
|
Type 1 LDAR survey
|
Offshore components above the sea level
|
12 months
|
|
|
Offshore components below the sea level
|
24 months
|
|
|
Offshore components below the seabed
|
36 months
|
|
Type 2 LDAR survey
|
Offshore components above the sea level
|
24 months
|
|
|
|
4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
|
|
4.
|
For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.
|
Part 2 Information requirements on devices used in LDAR surveys As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:
|
|
1. manufacturer information about the device;
|
|
1.
|
manufacturer information about the device;
|
|
|
2. information about the leak detection capabilities, reliability and limitations of the device …
|
|
2.
|
information about the leak detection capabilities, reliability and limitations of the device, including, but not limited to, the ability to identify specific leaks or locations, detection limits and any restrictions on use, as well as supporting data;
|
|
|
3. a description of where, when and how the device will be used.
|
|
3.
|
a description of where, when and how the device will be used.
|
|
,