+ANNEX I Leak detection and repair surveys as referred to in Article 14
---+1. For all aboveground and underground components, excluding distribution and transmission networks …
---+2. For all components of distribution and transmission networks, LDAR surveys shall be carried out …
---+3. For all offshore components, LDAR surveys shall be carried out at the following minimum …
---+4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …
---+1. manufacturer information about the device;
---+2. information about the leak detection capabilities, reliability and limitations of the device …
---+3. a description of where, when and how the device will be used.

ANNEX I Leak detection and repair surveys as referred to in Article 14

ANNEX I

Leak detection and repair surveys as referred to in Article 14

1. Áttekintés

,
Megnevezés Szabályozás
1. For all aboveground and underground components, excluding distribution and transmission networks …

1.

For all aboveground and underground components, excluding distribution and transmission networks LDAR surveys shall be carried out at the following minimum frequency:

Type of LDAR survey

Type of component

Frequency

Type 1 LDAR survey

Compressor station

Underground storage

LNG facility

Regulating and metering station

4 months

 

Valve station

9 months

Type 2 LDAR survey

Compressor station

Underground storage

LNG facility

Regulating and metering station

8 months

 

Valve station

18 months

Type of LDAR survey

Type of material

Frequency

Type 1 LDAR survey

Bitumen sheet

Grey cast iron

3 months

 

Asbestos

Ductile cast iron

6 months

 

Non-protected steel

Copper

9 months

 

Polyethylene

PVC

Protected steel

15 months

Type 2 LDAR survey

Bitumen sheet

Grey cast iron

6 months

 

Asbestos

Ductile cast iron

12 months

 

Non-protected steel

Polyethylene

PVC

Copper

18 months

 

Protected steel

30 months

Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.

2. For all components of distribution and transmission networks, LDAR surveys shall be carried out …

2.

For all components of distribution and transmission networks, LDAR surveys shall be carried out at the following minimum frequency:

Type of LDAR survey

Type of component

Frequency

Type 1 LDAR survey

(design pressure > 16 bar)

Compressor station

Regulating and metering station

4 months

 

Valve station

9 months

Type 2 LDAR survey

(design pressure > 16 bar)

Compressor station

Regulating and metering station

8 months

 

Valve station

18 months

Type 2 LDAR survey

(design pressure ≤ 16 bar)

Regulating and metering station

9 months

 

Valve station

21 months

Type of LDAR survey

Type of material

Frequency of survey

Type 1 LDAR survey

(design pressure > 16 bar)

Grey cast iron

Bitumen sheet

3 months

 

Asbestos

Ductile cast iron

6 months

 

Non-protected steel

Copper

12 months

 

Polyethylene

PVC

Protected steel

24 months

Type 2 LDAR survey

(design pressure > 16 bar)

Grey cast iron

Bitumen sheet

6 months

 

Asbestos

Ductile cast iron

12 months

 

Non-protected steel

Copper

24 months

 

Polyethylene

PVC

Protected steel

36 months

Type 2 LDAR survey

(design pressure ≤ 16 bar)

Grey cast iron

Bitumen sheet

6 months

 

Asbestos

Ductile cast iron

12 months

 

Non-protected steel

Copper

24 months

 

Polyethylene

PVC

Protected steel

36 months

Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.

LDAR surveys may be carried out using a two-step approach: first from a distance and, only where a leak is detected, via a second detection as close as possible to the source.

For underground and below-the-sea-level protected steel pipelines with design pressure above 16 bar, operators shall also perform risk-based preventive pipeline integrity management to prevent any leakage in accordance with relevant European standards or national pipeline integrity management legislation. Preventive pipeline integrity management shall include constant monitoring of flow, fluid composition, pressure and temperature of the gas transported in the system to ensure that those parameters correspond to the applicable pipeline integrity specifications, as well as to locate the source of potential methane emissions and to estimate them. Taking into account the results of that preventive pipeline integrity management, the competent authority may approve a different frequency of up to 36 months for a type 1 LDAR survey and up to 48 months for a type 2 LDAR survey.

3. For all offshore components, LDAR surveys shall be carried out at the following minimum …

3.

For all offshore components, LDAR surveys shall be carried out at the following minimum frequency:

Type of LDAR survey

Type of component

Frequency

Type 1 LDAR survey

Offshore components above the sea level

12 months

 

Offshore components below the sea level

24 months

 

Offshore components below the seabed

36 months

Type 2 LDAR survey

Offshore components above the sea level

24 months

4. For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 …

4.

For all other components, type 1 LDAR surveys shall be carried-out every 6 months and type 2 LDAR surveys shall be carried out every 12 months.

Part 2

Information requirements on devices used in LDAR surveys

As part of the LDAR programme referred to in Article 14 (1), operators must provide the following:

1. manufacturer information about the device;

1.

manufacturer information about the device;

2. information about the leak detection capabilities, reliability and limitations of the device …

2.

information about the leak detection capabilities, reliability and limitations of the device, including, but not limited to, the ability to identify specific leaks or locations, detection limits and any restrictions on use, as well as supporting data;

3. a description of where, when and how the device will be used.

3.

a description of where, when and how the device will be used.

1.1 Hivatkozások

1.2 Azonosított követelmények

1.3 Kapcsolódó szabványok

2. Azonosított követelmények

Követelmények
Forrás Követelmény

3. Kapcsolódó szabványok

Szabványok
Forrás Követelmény