+Article 62 4.
|
Article 62 4.
►M3
Where a notification has been made pursuant to paragraph 1, the appropriate authority, after consulting the authorities notified in accordance with points (a)(i) or (b) of that paragraph, shall assess the following matters: ◄
(a)
whether an alternative measure to the exercise of the write down or conversion power in accordance with Article 59(3) is available;
(b)
if such an alternative measure is available, whether it can feasibly be applied;
(c)
if such an alternative measure could feasibly be applied, whether there is a realistic prospect that it would address, in an adequate timeframe, the circumstances that would otherwise require a determination referred to in Article 59(3) to be made.
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- Builddate: 11.05.2026 00:00:00 -Doknr: CELEX:32014L0059
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|