+Article 5 5

Article 5 5

5.   Before submitting the proposed methodology to ACER, the ENTSO for Electricity shall conduct a consultation involving at least the regional coordination centres, industry and consumer organisations, producers or their trade bodies, transmission system operators and relevant distribution system operators, competent authorities, regulatory authorities and other relevant national authorities. The ENTSO for Electricity shall duly take into account the results of the consultation and present them, together with the proposed methodology, at a meeting of the ECG.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • Builddate: 14.06.2019 00:00:00 -Doknr: CELEX:32019R0941
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.